Collapse Claim Fails Due To Defectively Designed Roof and Deck
May 28, 2024 —
Tred R. Eyerly - Insurance Law HawaiiThe insured's claim for collapse of his roof and deck failed due to defective design and other exclusions under the policy. Dudar v. State Farm & Cas. Co., 2024 U.S. Dist. LEXIS 52706 (N.D. Ga. Feb. 6, 2024).
The insured submitted a claim to State Farm for damage to the roof ("Roof Claim"). State Farm's adjuster placed a ladder on the deck to access the roof and a portion of the deck collapsed. The insured then reported a claim to State Farm for damage to the deck ("Deck Claim"). The claims were denied and suit was filed.
The roof had leaked on several occasions prior to submission of the Roof Claim. On February 25, 2022, the insured discovered that a branch had cut a hole in the tarp, causing water to leak into the home. The insured performed repairs on the roof. On March 8, 2022, a storm caused more water to seep through the tarp into the ceilings and walls. Thereafter, the Roof Claim was submitted.
The damage from the leaking roof and the deck collapse were caused by rotting. The rotting, in turn, was caused by a combination of defective building design and resulting water damage from rain and storms over the years. The roof and deck were constructed to provide mutual support to one another. The roof did not contain an adequate slope, which caused water to seep down into the walls and flooring rather than to flow downward and away from the property. Over time, penetrating water caused portions of the roof, the floor, and the supporting wall between the roof and deck to rot.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Nevada Update: Nevada Commissioner of Insurance Updates Burning Limits Statute with Emergency Regulation
September 06, 2023 —
William S. Bennett - Saxe Doernberger & Vita, P.C. Following significant backlash in reaction to its enactment of legislation prohibiting enforcement of any provisions in liability insurance policies dictating that defense costs are included within the limits of insurance, the Nevada Division of Insurance issued an emergency regulation further clarifying the law.1
The regulation modifies two key aspects of the original law:
- The term “policy of liability insurance,” as used in the statute, shall only mean those casualty insurance policies offered by insurers authorized under NRS 680A.060 and NRS 694C.230 to issue third-party liability insurance. In other words, the statute’s restrictions on eroding limits will no longer apply to “non-admitted” insurers.
Read the court decisionRead the full story...Reprinted courtesy of
William S. Bennett, Saxe Doernberger & Vita, P.C.Mr. Bennett may be contacted at
wsb@sdvlaw.com
New York Court of Appeals Takes Narrow View of Labor Law Provisions in Recent Cases
July 03, 2022 —
Lisa M. Rolle & Matthew Feinberg - Traub LiebermanSince the end of March, the New York State Court of Appeals has issued decisions in favor of the defense concerning New York Labor Law §240 and §241. These pro-defendant decisions take a narrow view of the scope of the Labor Law provisions. However, while it remains to be seen how the Court’s below will apply the Court of Appeal’s reasoning, these recent decisions are beneficial for the defense bar going forward.
In Toussaint v Port Auth. of N.Y. & N.J March 22, 2022 N.Y. LEXIS 391 | 2022 NY Slip Op 01955 | 2022 WL 837579, the Court held that 12 NYCRR 23-9.9 (a), does not set forth a concrete specification sufficient to give rise to a non-delegable duty under Labor Law § 241 (6). In Toussaint Plaintiff, who was an employee of Skanska USA Civil Northeast, Inc., brought the lawsuit against the Port Authority asserting claims under Labor Law § 200 (1) and Labor Law § 241 (6) after he was struck by a power buggy while operating a rebar-bending machine at the World Trade Center Transportation Hub construction site owned by the Port Authority of New York and New Jersey. Power buggies are small, self-operated vehicles used to move materials on construction sites. On the day of the accident, a trained and properly designated operator drove the buggy into the area near the plaintiff's workstation. That vehicle operator got off the vehicle, but short time thereafter, another worker—who was not designated or trained to do so—drove the buggy a short while prior to losing control and striking plaintiff. Plaintiff relied upon 12 NYCRR 23-9.9(a) which states that “[no person other than a trained and competent operator designated by the employer shall operate a power buggy.” In rejecting plaintiff’s argument the Court held that the "trained and competent operator" requirement is general, as it lacks a specific requirement or standard of conduct.
Reprinted courtesy of
Lisa M. Rolle, Traub Lieberman and
Matthew Feinberg, Traub Lieberman
Ms. Rolle may be contacted at lrolle@tlsslaw.com
Mr. Feinberg may be contacted at mfeinberg@tlsslaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Limiting Plaintiffs’ Claims to a Cause of Action for Violation of SB-800
November 18, 2011 —
Samir R. Patel, Esq., Lorber, Greenfield, & Polito, LLPThere has been a fair share of publicity about the SB-800 amendments to the Civil Code (Civil Code section 896, et seq.) that codified construction defect litigation in 2002. Most of the publicity is geared toward the pre-litigation standards allowing a builder the right to repair before litigation is commenced by a homeowner. Less focus and attention has been given to the fact that violation of the SB-800 performance standards is being used by plaintiff’s counsel as an additional tool in the plaintiff’s pleading tool box against builders. Closer scrutiny to SB-800 reveals that those provisions should in fact act as a limitation to the pleading tools available to plaintiffs and an additional tool for builders in the defense of cases governed by SB-800.
The typical construction defect complaint contains the boiler plate versions of numerous causes of action. These causes of action include Strict Liability, Negligence, Negligence Per Se, Breach of Contract, Breach of Contract – Third-Party Beneficiary, Breach of Express Warranties, Breach of Implied Warranties, among others. The wide array of causes of action leave a defendant “pinned to the wall” because they require a complex defense on a multitude of contract and tort related causes of action. Furthermore, the statutes of limitations as to these claims widely differ depending upon if the particular defect is considered latent or patent. The truth of the matter remains, no matter what the circumstances, if a construction defect matter ultimately goes to trial, it is inevitable that plaintiffs will obtain a judgment on at least one of these causes of action.
On its own, the Strict Liability cause of action can be a thorn in a defendant’s side. A builder is obviously placing a product into the stream of commerce and strict liability is a tough standard to defend against, particularly when it concerns intricate homes comprised of multiple components that originally sold for hundreds of thousands of dollars. A Negligence cause of action can also be difficult to defend because the duty of care for a builder is what a “reasonable” builder would have done under the circumstances. An interpretation of this duty of care can easily sway a jury that will almost always consist of sympathetic homeowners. A Negligence Per Se cause of action can also leave a defendant vulnerable to accusations that a builder violated the Uniform Building Code or a multitude of other obscure municipal construction-related code provisions during the construction of the home. Lastly, the Breach of Contract cause of action leaves a builder relying on dense and intricate purchase and sale agreements with dozens of addenda which leave the skeptical jurors turned off by what they view as one-side, boilerplate provisions. Ultimately, when a matter is about to go to trial, the complexity of these complaints can benefit a plaintiff and increase a plaintiff’s bargaining power against a defendant who is attempting to avoid a potentially large judgment.
Enter the SB-800 statutes. The SB-800 statutes apply to all homes sold after January 1, 2003. Civil Code section 938 specifically states that “[t]his title applies only to new residential units where the purchase agreements with the buyer was signed by the seller on or after January 1, 2003.” (Civil Code §, 938.) As time progresses, more residential construction defect cases will exclusively fall under the purview of SB-800. Slowly but surely more SB-800 governed litigation is being filed, and its exclusive application is looming on the horizon.
On its surface, this “right to repair” regime has left builders with a lot to be desired despite the fact that it is supposed to allow the builder the opportunity to cure any deficiencies in their product before litigation can be filed by potential plaintiffs. However, the application of the time line for repair has shown to be impractical for anything but the most minor problems involving only small numbers of residential units. Moreover, the fact that the fruits of the builder’s investigation into the claimed defects in the pre-litigation context can freely be used as evidence against it in litigation makes builders proceed with trepidation in responding with a repair. For these reasons, more SB-800 litigation can be expected to result due to the shortcomings of the pre-litigation procedures, and savvy defense counsel should anticipate the issues to be dealt with in presenting the defense of such cases at trial.
This fact should not necessarily be met with fear or disdain. Within the SB-800 statutes, the legislature made it clear that they were creating a new cause of action for construction defect claims, but it further made it clear that this cause of action is a plaintiff’s exclusive remedy. The legislature giveth, but at the same time, the legislature taketh away. Throughout numerous provisions within the SB-800 statutes, the Civil Code states that claims for construction defects as to residential construction are exclusively governed by the Civil Code, and that the Civil Code governs any and all litigation arising under breaches of these provisions. Civil Code section 896 specifically states:
In any action seeking recovery of damages arising out of, or related to deficiencies in, the residential construction … the claimant’s claims or causes of action shall be limited to violation of, the following standards, except as specifically set forth in this title. (Civil Code §, 896.)
Civil Code section 896 then provides approximately fifty-plus standards by which a construction defect claim is assessed under that provision. Civil Code section 896 covers everything from plumbing to windows, and from foundations to decks, and in several instances expressly dictates statutes of limitations as to specific areas of construction that severely truncate the 10-year latent damage limitations period. As for any construction deficiencies that are not enumerated within Civil Code section 896, Civil Code section 897 explicitly defines the intent of the standards and provides a method to assess deficiencies that are not addressed in Civil Code section 896. Civil Code section 897 states:
Intent of Standards
The standards set forth in this chapter are intended to address every function or component of a structure. To the extent that a function or component of a structure is not addressed by these standards, it shall be actionable if it causes damage. (Civil Code §, 897.)
Therefore, Civil Code section 897 acts as a catch-all by which defects that are not covered within Civil Code section 896 can be evaluated on a damage standard mirroring the Aas case (damages must be present and actual). The result of sections 896 and 897 being read in combination is a comprehensive, all-inclusive set of performance standards by which any defect raised by Plaintiffs can be evaluated and resolved under a single SB-800 based cause of action.
Civil Code section 943 makes clear that a cause of action for violation of SB-800 performance standards is a plaintiff’s sole remedy for a residential construction defect action. Specifically, Civil Code section 943 states:
Except as provided in this title, no other cause of action for a claim covered by this title or for damages recoverable under 944 is allowed. In addition to the rights under this title, this title does not apply to any action by a claimant to enforce a contract or express contractual provision, or any action for fraud, personal injury, or violation of a statute. (Civil Code §, 943.)
Civil Code section 944 provides the method for computing damages within a construction defect action, as follows:
If a claim for damages is made under this title, the homeowner is only entitled to damages for the reasonable value of repairing any violation of the standards set forth in this title, [and] the reasonable cost of repairing any damages caused by the repair efforts… . (Civil Code §, 944.)
A cursory review of these statutes yields the conclusion that the legislature was attempting to create an exclusive cause of action that trumps all other causes of action where SB-800 applies. The remedy available to plaintiffs is limited to that allowed by the Civil Code. As noted above, “[n]o other cause of action for a claim covered by this title…is allowed.” (Civil Code §, 943.) Therefore, Civil Code sections 896, 897, 943, and 944 specifically prohibit the contract-based and tort-based causes of action typically pled by plaintiffs.
Plaintiff’s counsel has seized upon the language of section 943 to advance the argument that SB-800 still allows a plaintiff to advance typical contract and tort based causes of action. On the surface, this argument may seem compelling, but a minimum of scrutiny of the express language of section 943 dispels this notion. Section 943 says that it provides rights “[i]n addition” to those under the SB-800 Civil Code provisions. Clearly, the language in section 943 is intended to expressly underscore the fact that a plaintiff is not precluded from seeking relief in addition to that allowed under SB-800 for damages not arising from a breach of the SB-800 standards or for damages in addition to those recoverable under Section 944. This language does not provide an unfettered license to bring a Strict Liability, Negligence or other cause of action against a builder where SB-800 applies.
In fact, this language only keeps the door open for plaintiffs to pursue such causes of action not arising from a breach of the SB-800 standards should there be such supporting allegations. For example, if a plaintiff alleges that a builder breached an “express contractual provision” related to the timing of the completion of the home and close of escrow, and the contract specifies damages in this regard, a plaintiff may have a viable separate cause of action for Breach of Contract for recovery of those damages precisely because that is not an issue expressly dealt with in SB-800 in the performance standards under sections 896 and 897, or in the damage recovery terms under 944. As it stands, the vast majority of complaints are seeking redress for violation of the same primary right; that is, defects specifically outlined in Section 896 and 897 or which result in damages as stated in Section 944.
So, how does a builder defend against a complaint that contains multiple causes of action regarding construction defects for a home sold after January 1, 2003? There are numerous ways to approach this. First and foremost, these superfluous and improper causes of action can be attacked by demurrer seeking dismissal of all causes of action other than the cause of action alleging violation of SB-800. If the the time period within which to file a demurrer has passed already, a motion for judgment on the pleadings can be utilized to attack the improper causes of action in the same way as a demurrer can be used for this purpose.
The limitation to a demurrer or motion for judgment on the pleadings is that the judge is restricted to viewing only the four corners of the pleading when making a ruling. It is typical for plaintiffs’ counsel to cleverly (or one might even say, disingenuously) leave the complaint purposely vague to avoid a successful defense attack on the pleadings by not including the original date the residence was sold. In that instance, a motion for summary adjudication can be used to attack a plaintiff’s complaint. By simply providing evidence that the homes were originally sold after January 1, 2003, the improper causes of action should be subject to dismissal by summary adjudication. If the plaintiff is a subsequent purchaser, the builder still has recourse to enforce the pleading limitations under SB-800. Civil Code section 945 states that “[t]he provisions, standards, rights, and obligations set forth in this title are binding upon all original purchasers and their successors-in-interest.” (Civil Code §, 945.)
Attacking a plaintiff’s complaint to eliminate multiple causes of action can have numerous benefits. The practical result is that a plaintiff will only have one viable cause of action. The advantage is that the SB-800 performance standards include the defined performance standards and shortened statutes of limitations periods with regard to specific issues. Furthermore, as to defects which are not specifically provided for in Civil Code section 896, Civil Code section 897 requires a proof of actual damages. Therefore, a plaintiff must provide evidence of current damages and not simply conditions that may potentially cause damage in the future.
The Appellate Courts have yet to directly address and interpret these SB-800 provisions. The time for that is undoubtedly drawing near. For now, however, plaintiffs will have to find ways to accurately plead construction defect claims within the confines of one cause of action for breach of the performance standards enumerated within the Civil Code.
Printed courtesy of Lorber, Greenfield & Polito, LLP. Mr. Patel can be contacted at spatel@lorberlaw.com and Mr. Verbick at tverbick@lorberlaw.com.
Read the court decisionRead the full story...Reprinted courtesy of
Rio Olympics Work Was a Mess and Then Something Curious Happened
April 06, 2016 —
Jonathan Levin, Tariq Panja & David Biller – BloombergIn early 2014, a senior Olympic Committee official returned from a trip to Rio de Janeiro and declared Brazil’s preparations for the Summer Games to be the worst he’d ever seen. In the two years since, a crippling recession set in, dozens of construction executives were ensnared in a nationwide corruption scandal and the president has been pushed to the brink of impeachment.
And the preparations?
They’re basically fine now, actually. In what is emerging as a rare bright spot in a country buffeted by crisis on all sides, the organizing committee is saying that more than 95 percent of the venues are complete some four months ahead of the opening ceremony and, what’s more, data shows spending has largely remained under control.
Reprinted courtesy of Bloomberg reporters
Jonathan Levin,
Tariq Pania and
David Biller Read the court decisionRead the full story...Reprinted courtesy of
New Executive Orders Expedite the Need for Contractors to Go Green
August 22, 2022 —
Vince Calio - Construction ExecutiveThe importance of going green just became even more crucial for small construction companies, as President Joe Biden signed three executive orders on June 6, 2022, aimed at boosting clean energy construction projects and the use of domestically manufactured clean energy technology.
Specifically, the orders require the U.S. Department of Energy to deploy the use of the Defense Production Act of 1950 to expand American manufacturing of solar panel parts, environmentally friendly building insulation, heat pumps, equipment for making clean power-generating fuels and critical power grid infrastructure. Federal construction contracts will also require local contractors to use eco-friendly materials.
According to an announcement from the White House, the order will encourage the use of project labor agreements that offer wages “above and beyond the prevailing rate and include local hire provisions.” The order will also encourage clean construction projects in low-income areas burdened by legacy pollution.
Reprinted courtesy of
Vince Calio, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
The Texas Supreme Court Limits the Use of the Economic Loss Rule
September 03, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to David Fisk of Kane Russell Coleman & Logan PC, in an article published by JD Supra Business Advisor, “[T]he Texas Supreme Court issued a per curium opinion limiting the application of the economic loss doctrine or rule, as it is referred to in Texas, in the context of residential construction defect claims.”
In Chapman Custom Homes, Inc. v Dallas Plumbing Co., the court “ruled that a plumbing subcontractor assumes an implied duty not to flood or otherwise damage a home while performing its contract with a builder” and that “the economic loss rule does not apply in this context.”
Read the court decisionRead the full story...Reprinted courtesy of
Design Immunity Defense Gets Special Treatment on Summary Judgment
March 29, 2021 —
Garret Murai - California Construction Law BlogThis may be one that is more for the lawyers than it is for the contractors or owners.
If you’ve ever filed a motion for summary judgment or summary adjudication you know the standard is clear. You’re going to lose if the court finds a disputed issue of material fact. In other words, since summary judgment or summary adjudication is such an extreme remedy – you win without having to go to trial after all – the standard is pretty high. Thus, if there’s a dispute as to a material fact (was the light green or was it red?) it’s enough that the court will deny your motion.
That is, unless you’re seeking summary judgment or adjudication on a design immunity defense as the next case, Menges v. Department of Transportation, Case No. G057643 (December 24, 2020), reveals.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com