Clean Energy and Conservation Collide in California Coastal Waters
March 19, 2024 —
Nadia Lopez & Josh Saul - BloombergTwo of President Joe Biden’s biggest priorities — conservation and the switch to clean energy — are colliding in the ocean off California’s quiet Central Coast.
Located halfway between San Francisco and Los Angeles, Morro Bay boasts a rich ecosystem of fish, otters and migrating whales that the Indigenous Chumash people want to protect with a
new marine sanctuary. But 20 miles (32 kilometers) out, developers plan some of the West Coast’s
first offshore wind farms, where 1,100-foot-tall turbines (335 meters) tethered to the seabed will help California cut its carbon emissions.
One US government agency appears poised to approve the sanctuary. Another
already leased 376 square miles of ocean for wind development, just outside the sanctuary’s boundaries. Now, a fight is brewing over whether the scenic bay itself should be left out of the sanctuary, to give undersea power cables from the wind farms a place to come onshore.
Reprinted courtesy of
Nadia Lopez, Bloomberg and
Josh Saul, Bloomberg Read the court decisionRead the full story...Reprinted courtesy of
No Coverage for Collapse of Building
January 04, 2021 —
Tred R. Eyerly - Insurance Law HawaiiDamage to a building caused by the break of a water pipe was not a collapse under the policy. Naabani Twin Stars v. Travelers Cos., 2020 U.S. Dist. LEXIS 196443 (D. N. M. Oct. 22, 2020).
An underground water line ruptured on plaintiffs property This caused a collapse under the adjacent parking lot, which in turn caused land beneath the building go change positions and damage the building. A geotechnical consultant concluded that a material change in the site conditions occurred as a direct result of the rupture of the water pipe in the parking lot, and that those changes directly affected the settlement of the building.
Travelers denied coverage for the damage. Travelers concluded that the building settlement was the result of subsurface movement, which invoked the earth movement exclusion. Travelers inspection concluded that the building was not in a state of collapse. The policy defined collapse as "an abrupt falling down or caving in of a building or structure, or any part of a building or structure, with the result that the building, or part of the building, cannot be occupied for its intended purpose."
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Insurer's Motion for Summary Judgment on Business Interruption Claim Denied
September 12, 2022 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer's motion to cap a potential business interruption claim after the insured failed to provide documentation was denied. Lake Charles Instruments Inc. v. Scottsdale Ins. Co., 2022 U.S. Dist. LEXIS 116802 (W.D. La. July 2, 2022).
Plaintiff operated a business that was damaged during Hurricane Laura on August 27, 2020, and subsequently by Hurricane Delta on October 9, 2020. Plaintiff had a commercial property policy issued by Scottsdale that provided business income coverage of up to $500,000.
After Hurricane Laura, plaintiff submitted a claim. Plaintiff requested an advance. Scottsdale paid $50,000 on the business interruption (BI) claim while reserving rights to require full compliance with the policy, including submission of appropriate documentation. Scottsdale continued to request documentation, but none was received. Plaintiff also failed to provide documentation for its BI claim after Hurricane Delta. When documentation was finally provided, Scottsdale disputed that the documentation showed a BI claim that exceeded policy limits. Scottsdale determined the BI claim was below the policy limits.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Affordable Global Housing Will Cost $11 Trillion
October 08, 2014 —
Flavia Krause-Jackson – BloombergReplacing the world’s substandard housing and building affordable alternatives to meet future global demand would cost as much as $11 trillion, according to initial findings in a McKinsey & Co. report.
The shortage of decent accommodation means as many as 1.6 billion people from London to Shanghai may be forced to choose between shelter or necessities such as health care, food and education, data disclosed at the 2014 CityLab Conference in Los Angeles show. McKinsey will release the full report in October.
The global consulting company says governments should release parcels of land at below-market prices, put housing developments near transportation and unlock idle property hoarded by speculators and investors. The report noted that China fines owners 20 percent of the land price if property is undeveloped after a year and has the right to subsequently confiscate it.
Read the court decisionRead the full story...Reprinted courtesy of
Flavia Krause-Jackson, BloombergMs. Krause-Jackson may be contacted at
fjackson@bloomberg.net
Traub Lieberman Partners Dana Rice and Jason Taylor Obtain Summary Judgment For Insurance Carrier Client in Missouri Federal Court Coverage Action
April 19, 2022 —
Dana A. Rice & Jason Taylor - Traub LiebermanTraub Lieberman Partners Dana Rice and Jason Taylor were recently successful in obtaining summary judgment for a national insurance carrier client in a federal court declaratory judgment action pending in Missouri. The underlying lawsuit involved two wrongful death actions brought against an insured responsible for performing demolition work on a freight elevator shaft as part of a larger demolition project. The two decedents were operating a motorized wire rope pulley inside the shaft when the system failed, causing the work basket occupied by the decedents to fall and resulting in fatal injuries to the workers. Two state court actions followed against the general contractor on the project, the insured, and various other product suppliers and manufacturers of the freight elevator equipment.
The firm’s client issued commercial general liability insurance policy, which included an “Injury to Employees, Contractors, Volunteers and Other Workers” exclusion that precluded coverage for bodily injury to a broad variety of workers. As respects the insured, the underlying plaintiffs alleged that the decedent-workers were “employed by” the insured, such that the carrier argued the “Injury to Workers” exclusion barred coverage. The carrier filed a declaratory judgment action in the U.S. District Court for the Eastern District of Missouri seeking a declaration that the insurer had no duty to defend or indemnify its insured for the underlying state court actions under the exclusion, and moved for judgment on the pleadings. The carrier also claimed a related “Contractors and Subcontractors” exclusion barred coverage.
Reprinted courtesy of
Dana A. Rice, Traub Lieberman and
Jason Taylor, Traub Lieberman
Mr. Rice may be contacted at drice@tlsslaw.com
Mr. Taylor may be contacted at jtaylor@tlsslaw.com
Read the court decisionRead the full story...Reprinted courtesy of
More on the VCPA and Construction
February 01, 2023 —
Christopher G. Hill - Construction Law MusingsI have posted before regarding the intersection between the Virginia Consumer Protection Act (VCPA) and construction contracting in regard to residential construction projects. A case out of the Eastern District of Virginia District Court further discusses this intersection as it relates to design contracts that also include the procurement and installation of certain design elements post-design. The basic facts of Marcus v Dennis are as follows:
In October of 2018, Defendant Marlene Dennis, the owner of Marlene Dennis Design, LLC (“MDD”), operating out of Virginia, entered into a contract to provide design services and the procurement and installation of certain design elements for the Plaintiffs, Gregory and Jamie Marcus, at their Maryland home. The Marcuses agreed to $175 per hour to Dennis with a cap of a total of $100,000.00 for design consultation and furniture selection and procurement. The Marcuses also agreed that they would pay no more than $250,000.00 for furnishings, rugs, artwork, decorative lighting, and accessories. In November 2020, Dennis sent an invoice for $68,000.00 and informed the Plaintiffs that the total contract fees would be more than the $100,000.00 cap. After paying $124,722.41 in design fees, the Plaintiffs received an invoice for $255,5560.72 in January of 2021. Despite the cap of $250,000.00, the Plaintiffs wired $255,000.00 to Dennis while requesting the backup invoices for the material charges. After much effort and a threat of litigation, the Plaintiffs received documents from Dennis showing that Dennis inflated the costs of the materials prior to passing the costs along to the Marcuses. The Plaintiffs’ home was unfurnished and empty as of April 10, 2021, and the Marcuses had to hire and pay another design team over $85,000.00 to finish Dennis’ work. Needless to say, the Marcuses sued both Dennis and her firm for breach of contract, breach of fiduciary duty, and for violation of the VCPA. Dennis moved to dismiss the Complaint.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Disappointment on an Olympian Scale After Rio 2016 Summer Games
February 23, 2017 —
Augusto Diniz, O Empreiteiro - Engineering News-RecordThe single word to describe the sports infrastructure created for the Rio 2016 Olympic Games is abandonment. Uncertainty over the future of the dilapidated sports stadiums and arenas threatens the legacy of the Olympics, which ended five months ago.
Read the court decisionRead the full story...Reprinted courtesy of
Augusto Diniz, O Empreiteiro, ENRENR may be contacted at
ENR.com@bnpmedia.com
BKV Barnett, LLC v. Electric Drilling Technologies, LLC: Analyzing the Impact of Colorado’s Anti-Indemnification Statute
December 23, 2024 —
David M. McLain – Colorado Construction Litigation BlogIn the recent case of BKV Barnett, LLC v. Electric Drilling Technologies, LLC, the United States District Court for the District of Colorado dealt with significant legal issues concerning indemnification and insurance obligations in construction agreements. The ruling, handed down on September 26, 2024, serves as a crucial reminder of the limitations imposed by Colorado’s Anti-Indemnification Statute, C.R.S. § 13-21-111.5, and its implications for contracts in the construction industry.
This case arose from a Master Service Contract (“MSC”) between BKV Barnett, LLC (“BKV”) and Electric Drilling Technologies, LLC (“EDT”), in which EDT provided electrical services and equipment to an oil and gas lease wellsite in Texas. Following a lightning strike in early 2022 that damaged electrical infrastructure at the site, EDT dispatched Turn Key Utility Construction to repair the damage. During the repair work, an arc flash occurred, causing significant injuries to one of Turn Key’s employees, Matthew Lara, leading to a personal injury lawsuit filed by Lara in Dallas County, Texas. BKV sought indemnification, defense, and additional insured status from EDT under the terms of their MSC, which EDT contested.
Read the court decisionRead the full story...Reprinted courtesy of
David McLain, Higgins, Hopkins, McLain & RoswellMr. McLain may be contacted at
mclain@hhmrlaw.com