Superintendent’s On-Site Supervision Compensable as Labor Under Miller Act
March 13, 2023 —
David Adelstein - Florida Construction Legal UpdatesA recent Miller Act payment bond decision out of the District of Columbia Circuit Court of Appeals, U.S. f/u/b/o Civil Construction, LLC v. Hirani Engineering & Land Surveying, PC, 58 F.4th 1250 (D.C. Circ. 2023), dealt with the issue of whether a subcontractor’s superintendent constitutes recoverable “labor” within the meaning of the Miller Act and compensable as a cost under the Miller Act that typically views labor as on-site physical labor.
The issue is that the Miller Act covers “[e]very person that has furnished labor or material in carrying out work provided for in a contract.” Civil Construction, supra, at 1253 quoting 40 U.S.C. s. 3133(b)(1). The Miller Act does not define labor. The subcontractor claimed labor includes actual superintending at the job site. The surety disagreed that a superintendent’s presence on a job site constitutes labor as the superintendent has to actually perform physical labor on the job site to constitute compensable labor under the Miller Act.
The subcontractor argued its subcontract and the government’s quality control standards required detailed daily reports that verified manpower, equipment, and work performed at the job site. It further claimed its superintendent had to continuously supervise and inspect construction activities on-site: “[the] superintendent had to be on-site to account for, among other things, hours worked by crew members, usage and standby hours for each piece of equipment, materials delivered, weather throughout the day, and all work performed. These on-site responsibilities reflected the government’s quality control standards, under which the superintendent as ‘the most senior site manager at the project, is responsible for the overall construction activities at the site…includ[ing] all quality, workmanship, and production of crews and equipment.” Civil Construction, supra, at 1253-54.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Amazon HQ2 Puts Concrete on an Embodied Carbon Diet
January 17, 2022 —
Nadine M. Post - Engineering News-RecordBefore the ground-breaking for Amazon’s 2.1-million-sq-ft Metropolitan Park office development across the Potomac River from the nation’s capital, Clark Construction Group’s John Swagart and Jeff King walked door to door, introducing themselves to shopkeepers near the MetPark site. The good-will ambassadors were pounding the pavement to inform MetPark’s neighbors of the plan to dig a 50-ft-deep hole—710 ft x 310 ft—and create two 22-story buildings.
Reprinted courtesy of
Nadine M. Post, Engineering News-Record
Ms. Post may be contacted at postn@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Wow! A Mechanic’s Lien Bill That Helps Subcontractors and Suppliers
March 05, 2015 —
Christopher G. Hill – Construction Law MusingsYou know how I’ve stated on many occasions that the contract is king here in Virginia? You know how that included contractual provisions waiving mechanic’s lien rights for subcontractors and suppliers? You know how I thought that the General Assembly would not do anything to make mechanic’s liens in Virginia easier to prosecute?
Well, it seems, at least for waivers of mechanic’s lien rights by subcontractors and suppliers (more about general contractors later) I was wrong. This General Assembly session, the Senate introduced a bill, that has now passed both houses as of February 25, 2015, that adds language to Virginia Code Section 43-3 that effectively nullifies any contractual waiver of lien rights prior to any work having been performed by any tier of construction company aside from general contractors.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher G. Hill, Law Office of Christopher G. Hill, PCMr. Hill may be contacted at
chrisghill@constructionlawva.com
New York Appellate Court Expands Policyholders’ Ability to Plead and Seek Consequential Damages
February 27, 2019 —
Michael S. Levine & Joshua S. Paster - Hunton Andrews KurthIn a huge win for policyholders, a New York appellate court, in D.K. Property, Inc. v National Union Fire Insurance Company of Pittsburgh, Pa., held that an insured need not provide a detailed factual description or explanation for why consequential damages are recoverable at the pleading stage. Rather, an insured’s complaint must only (i) specify the types of consequential damages claimed; and (ii) allege that those damages reasonably were contemplated by the parties prior to contracting.
Here, D.K. Property’s building was damaged as a result of construction on an adjoining building, and it timely filed a claim with National Union under a policy that covers “direct physical loss or damage to” the building. National Union neither paid the claim nor disclaimed coverage. Instead, according to D.K. Property, National Union made unreasonable and increasingly burdensome information demands over a three-year period, which it alleges was a “tactic” to make pursuing the claim so expensive that D.K. Property would abandon the claim. As a result of the delay, D.K. Property alleges the structural damage to its building has worsened.
Reprinted courtesy of
Michael S. Levine, Hunton Andrews Kurth and
Joshua S. Paster, Hunton Andrews Kurth
Mr. Levine may be contacted at mlevine@HuntonAK.com
Mr. Paster may be contacted at jpaster@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
SE 2050 Is In Quixotic Pursuit of Eliminating Embodied Carbon in Building Structures
January 23, 2023 —
Nadine M. Post - Engineering News-RecordWalking to work one November morning, structural engineer Chris Jeseritz was buoyed by a Nelson Mandela quotation on a digital sign on the side of a Seattle office tower: “A winner is a dreamer who never gives up.”
Reprinted courtesy of
Nadine M. Post - Engineering News-Record
Ms. Post may be contacted at postn@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Waive It Goodbye: Despite Evidence to the Contrary, Delaware Upholds an AIA Waiver of Subrogation Clause
April 19, 2022 —
Lian Skaf - The Subrogation StrategistSubrogation professionals have always been looking for ways to defeat onerous waiver of subrogation provisions in contracts signed by insureds. However, even when contracts are unsigned, if there is intent when the contract is made – usually long before a loss occurs – a waiver of subrogation can doom what otherwise may have been a strong case. The Superior Court of Delaware considered such a scenario to determine whether a waiver of subrogation provision applied to a multimillion-dollar subrogation case.
In State of Delaware Insurance Coverage Office and Factory Mutual Insurance Co., both as subrogee of the University of Delaware v. DiSabatino Construction Co., Schlosser & Associates Mechanical Contractors, Inc. and V.E. Guerrazzi, Inc., C.A. No. N19C-08-080, 2022 Del. Super. LEXIS 108 (March 17, 2022), the court granted the defendants’ motions for summary judgment, holding that the plaintiffs’ claims were barred by a waiver of subrogation provision in the underlying contract. Thus, the court held that the plaintiffs could not pursue the defendants in their suit to recover damages as a result of a fire. The court specifically denied the plaintiffs’ argument that since the contract was not signed and another “short form” version was later used the waiver of subrogation provision should not apply.
Read the court decisionRead the full story...Reprinted courtesy of
Lian Skaf, White and Williams LLPMr. Skaf may be contacted at
skafl@whiteandwilliams.com
Real Estate & Construction News Roundup (7/17/24) – Housing Inflation to Remain High, Proptech Investment to Fall and Office Vacancy Rates to Reach Peak in 2025
August 26, 2024 —
Pillsbury's Construction & Real Estate Law Team - Gravel2Gavel Construction & Real Estate Law BlogIn our latest roundup, construction backlog to see positives signs, regional banks to be conservative on buybacks, U.S. metro areas to permit few new housing units, and more!
- Venture capital investments in proptech and adjacent companies fell 14.3% in the first half of the year. (Leslie Shaver, Multifamily Dive)
- The expectation of interest rate cuts by the Federal Reserve later this year due to easing inflation and cooling economic growth is a positive sign for construction backlog. (Sebastian Obando, Construction Dive)
- The U.S. office real estate sector is now in three markets, each with different performance, but the overall office vacancy rate will reach a 21.6% peak in the second half of 2025. (Nish Amarnath, Construction Dive)
Read the court decisionRead the full story...Reprinted courtesy of
Pillsbury's Construction & Real Estate Law Team
Delays in Filing Lead to Dismissal in Moisture Intrusion Lawsuit
September 09, 2011 —
CDJ STAFFThe Alabama Court of Civil Appeals has upheld a summary judgment in the case of Franklin v. Mitchell. Walter Mitchell, doing business as Southern Classic Construction built a new home for the Franklins. The Franklins moved into the home in October 2001. In April 2006 they discovered sagging floors in both the bathroom and kitchen. They contacted Mitchell who suggested the flooring might be defective. The Franklins spent eight months attempting to contact the flooring manufacturer.
In March 2007, the Franklins had the home inspected. The sagging was determined to be due to a loss of strength in the decking because of condensation from the air conditioning system. Air returns were not properly sealed and drawing moisture into the structure. There was mold on the decking and floor joints.
When Mitchell was contacted by the Franklins, he told them his one-year warranty had expired but had the HVAC subcontractor, Southern Mechanical Heating & Air (owned by Mitchell’s father, Jim Mitchell), look at the situation. SMHA replaced and braced subfloors. Later, they entered the crawl space to tape ducts, seal the air return, and insulate the air vent housing. The Franklins were not satisfied with the repairs, as not all the ducts were taped, nor were the air vent housings insulated.
Franklin complained to Walter Mitchell who again cited his one-year warranty. Jim Mitchell said he would not report complaints to his insurer, stating that the repairs were unnecessary, that the work had been done correctly in the first place, and it was only done at the request of Walter Mitchell.
In February 2009, the Franklins sued Walker Mitchell. Mitchell denied the claims, citing in part the statute of limitations. Mitchell also filed complaints against three subcontractors, including his father’s firm. Mitchell received a summary judgment as the case started after Alabama’s six-year statute of limitations.
The appeals court rejected the Franklin’s argument that the claim of damage did not start until they were aware it was due to a construction defect. The court noted that as Walter Mitchell was licensed as a “residential home builder, the statute the Franklins cite did not apply, as it concerns architects, engineers, and licensed general contactors.”
Nor did they feel that Mitchells’ claim that his warranty had expired were sufficient to override the statute of limitations, quoting an earlier case, “Vague assurances do not amount to an affirmative inducement to delay filing suit.” Their claim of subsequent negligent repairs was rejected because Mitchell did not direct the specific actions taken by his father’s firm.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of