Drafting the Bond Form, Particularly Performance Bond Form
July 14, 2016 —
David Adelstein – Florida Construction Legal UpdatesOftentimes, when it comes to payment and performance bonds (in particular), the bond forms are drafted by the obligee. For example, an owner (as the obligee) may draft the bond forms that it wants its general contractor’s surety to execute. And, a general contractor (as the obligee) may draft the bond forms that it wants its subcontractors’ sureties to execute. As an obligee, it is always beneficial to draft the bond form (particularly the performance bond) that you want the surety to execute. The bond is to benefit you—the obligee—so having a hand in creating conditions to trigger the application of the bond is important, specifically when it comes to triggering a performance bond upon the bond-principal’s default.
Read the court decisionRead the full story...Reprinted courtesy of
David M. Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
The Johnstown Dam Failure, as Seen in the Pages of ENR in 1889
April 08, 2024 —
Scott Lewis - Engineering News-RecordThe small headline of the Engineering News article shown here belies the gravity of the disaster: the deadliest dam failure in U.S. history. The South Fork Dam in Pennsylvania was a 72-ft-tall, 931-ft long earth and rockfill structure. After a stop-and-start construction process over a dozen years, it was completed in 1853. The dam went through several changes of ownership and was repaired inadequately. Fish screens were installed that obstructed the spillway and caused water to overtop and erode the structure. This mass of water uprooted trees, rocks, houses, rail cars and animals as it thundered down the valley before smashing into a stone railway embankment. Fires ignited by wrecked locomotives burned for three days. The death toll was 2,208.
Reprinted courtesy of
Scott Lewis, Engineering News-Record
Mr. Lewis may be contacted at lewisw@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Court Holds That Trimming of Neighbor’s Trees is Not an Insured Accident or Occurrence
June 10, 2015 —
Christopher Kendrick and Valerie A. Moore – Haight Brown & Bonesteel LLPIn Albert v. Mid-Century Insurance Co. (No. B257792, filed 4/28/15, ord. pub. 5/20/15), a California Court of Appeal held that an insured’s trimming of a neighbor’s trees which allegedly damaged the trees was not an accident or occurrence covered by her homeowners insurance, despite a mistaken and good faith belief as to where the property line lay.
Ms. Albert was sued by her adjoining neighbor, who alleged damage to his property when she erected an encroaching fence and pruned nine mature olive trees on his property. The two parcels shared a reciprocal roadway easement providing for access to the main public road. At some point, Ms. Albert erected a fence that was subsequently determined to be on the neighbor’s land, and which enclosed a grove of nine mature olive trees. Ms. Albert claimed that the trees straddled the property line and were mutually owned. She pointed out that she had regularly been notified by the Los Angeles Fire Department to clear the area, and that she had been trimming the trees for years. Thus, she claimed a good faith belief that the trees were hers and that she was required to trim them.
Contending that her trimming had caused severe damage by reducing the aesthetic and monetary value of the trees, the neighbor sued alleging causes of action for trespass to real property and trees; abatement of private nuisance; declaratory relief; and for quiet title. He sought treble damages under Civil Code sections 733 and 3346, for injury to timber or trees.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com; Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Be Mindful Accepting Payment When Amounts Owed Are In Dispute
August 29, 2022 —
Nicholas Korst - Ahlers Cressman & Sleight PLLCAfter completing work on a project, or even during a project, it is not uncommon for some portion of the contract balance and/or a claim to be in dispute. As a contractor or subcontractor, it is important to be careful what is signed (or not signed) upon receipt of any payment both during and after completion of work on a project. One of the most common documents signed related to a receipt of payment is a lien/claim release document. This can be in the form of a conditional, unconditional, progress and/or final release. The language included in the release document is critically important, especially as it pertains to disputed amounts. As a contractor or subcontractor, if there are known disputes related to amounts owing, whether it be contract balance, disputed change order(s), a delay or inefficiency claim, or any other amounts believed to be owed, it is important to include language in the lien release that expressly carves out the disputed amounts. The same should be done for disputes related to extensions of time. This allows the contractor to accept the payment and release rights for the undisputed work, but continue to reserve its right to pursue the amounts in dispute later. If disputed amounts are not carved out, those amounts may effectively be waived and the subcontractor or contractor may lose all rights to recovery.
As a subcontractor in Alaska recently learned, there are potentially other ways a contractor may waive or lose its rights to recover amounts in dispute – without even signing a waiver or release document. In Smallwood Creek, Inc. v. Build Alaska General Contracting, LLC et al., the general contractor sent the subcontractor a check described as “final payment.” The subcontractor believed it was owed more than what the general contractor had sent and refused to accept the check. Months later, the subcontractor deposited the check. The subcontractor reversed course again and attempted to repay the general contractor the amount deposited. The general contractor refused, claiming the subcontractor’s acceptance of payment constituted satisfaction of all amounts owing to the subcontractor.
Read the court decisionRead the full story...Reprinted courtesy of
Nicholas Korst, Ahlers Cressman & Sleight PLLCMr. Korst may be contacted at
nicholas.korst@acslawyers.com
How Technology Reduces the Risk of Façade Defects
March 20, 2023 —
Ori Aphek - Construction ExecutiveThe shell of the building is an onlooker’s first impression and crafts the architectural aesthetic, but it also plays a crucial role in enabling energy efficiency and protecting against the elements. Because façades are in direct contact with the elements, issues with water intrusion are the most common problem and the costliest to remedy, with anywhere from 30% to 70% of lawsuits related to water intrusion, half of it through the façade. Additionally, improperly installed façades pose significant safety risks because unsecured parts can fall and hit people below.
All these factors contribute to the façade being one of the most complex and costly aspects of a building to construct and inspect, making up 205 of the total project cost. Installing these systems correctly the first time is the most effective way to mitigate these threats. Teams should utilize data-informed technology that ensures plan adherence, reducing risk and avoiding errors during installation.
The Challenges of Façade Installation
Façade installation and subsequent inspection are inherently challenging, particularly for high-rise buildings. When performing post-installation verification manually, inspectors must review every element, joint by joint, window by window, stone by stone and brick by brick, which can take months to complete. Inspections of the entire building system are limited by this process, as inspectors can only access one portion of the building façade at a time and often have to inspect from indoors, on balconies or at the ground level, which doesn’t paint a complete picture. As a result, teams typically only perform spot checks on the façade and are rarely inspected to their fullest. This leaves many installation errors and defects, which serve as ticking bombs for future water intrusion or safety hazards.
Reprinted courtesy of
Ori Aphek, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Defects in Texas High School Stadium Angers Residents
March 07, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to WFAA News, many residents of Allen, Texas were upset when their tax dollars were spent on a new high school football stadium, and they are angry now that alleged construction defects may cause the stadium to close, and perhaps not even reopen again this fall.
There “is a disproportionately large amount of our tax dollars that goes just to Allen ISD," Rachel Palmer, an Allen resident, told WFAA News.
However, Ben Pogue, president of Pogue Construction, the stadium’s general contractor called the situation “a road bump.” WPAA News also interviewed Dr. Simon Chao of the Department of Civil Engineering at the University of Texas at Arlington: "Cracking is fairly common in concrete," Chao stated. "The problem is the damage water may cause by getting in the cracks.”
Read the court decisionRead the full story...Reprinted courtesy of
Breach Of Duty of Good Faith And Fair Dealing Packaged With Contract Disputes Act Claim
March 27, 2023 —
David Adelstein - Florida Construction Legal UpdatesAn interesting opinion on a motion to dismiss came out of the United States Court of Federal Claims dealing with the claim that the government breached its duty of good faith and fair dealing in administering the prime contract. The contractor’s argument was that the government breached its duty of good faith and fair dealing by denying the contractor’s claim under the Contract Disputes Act (CDA). This was a creative claim and argument that deserves consideration because it tied in the contracting officer’s denial of the CDA claim for additional money with a breach of the duty of good faith and fair dealing.
In this case, Aries Construction Corp. v. U.S., 2023 WL 2146598 (Fed. Cl. 2023), a prime contractor was hired for a water pipeline construction project. The contractor encountered unexpected difficult site conditions that required additional equipment and labor. The contractor informed the contracting officer and alleged it was instructed to proceed with the additional equipment and labor. The contractor submitted a claim under the CDA but the contracting officer denied the claim. The contractor pursued the claim in the United States Court of Federal Claims arguing the government breached the contract and, of interest, breached its duty of good faith and fair dealing.
The government moved to dismiss the breach of good faith and fair dealing claim arguing that besides failing to state a cause of action the Court of Federal Claims had no jurisdiction because the breach of the duty of good faith and fair dealing was not properly presented to the contracting officer under the CDA. The Court of Federal Claims denied the government’s motion.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Is Arbitration Okay Under the Miller Act? It Is if You Don’t Object
October 15, 2014 —
Christopher G. Hill – Construction Law MusingsI have discussed both payment bond claims under the Miller Act and alternate dispute resolution (ADR) here at Construction Law Musings on many an occasion. A question that is sometimes open is what to do when there is contractually mandated arbitration for claims “relating to the contract or the work.”
While here in Virginia, as in most places, the courts will almost automatically send any breach of contract case with such a clause to arbitration, a question exists whether the claim against the bond held by a surety that is not a party to the contract is subject to being referred. Well, in a recent opinion the District Court for the Eastern District of Virginia in Norfolk weighed in on this question where there was no opposition or objection to a motion to stay pending arbitration.
In U.S. for Use of Harbor Construction Co. Inc. v. THR Enterprises Inc. the Court considered a fairly typical payment dispute leading to a Miller Act claim. The general contractor and surety filed a motion to dismiss or alternatively stay the litigation based upon a clause in the contract between general contractor and subcontractor allowing the general contractor to elect the type of ADR to be used to resolve the dispute.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher G. Hill, Law Office of Christopher G. Hill, PCMr. Hill may be contacted at
chrisghill@constructionlawva.com