Substituting Materials and Failure to Comply with Contractual Requirements
November 19, 2021 —
David Adelstein - Florida Construction Legal UpdatesIt is important to remember that if you are going to substitute materials from those specified, you need to make sure there is proper approval in doing so–make sure to comply with the contractual requirements to substitute materials. Otherwise, you could be in a situation where you are contractually required to remove the installed substituted materials and replace with the correct specified materials. This is not the situation you want to find yourself in because this is oftentimes a costly endeavor. This was the situation in Appeal-of-Sauer, Inc., discussed below, on a federal project. The best thing that you can do is comply with the contractual requirements if you want to substitute materials. If you are in the situation where it is too late, i.e., you already installed incorrect materials, you want to demonstrate the substituted materials are functionally equivalent to the specified materials and/or come up with an engineering solution, as required, that could be less costly then ripping out the installed material and replacing with the correct material. Even doing so, however, is not a “get out of jail free card” and does not necessarily mean there is not a strong basis to require you to install the correct specified material.
In Appeal of- Sauer, Inc., ASBCA 61847, 2021 WL 4888192 (ASBCA September 29, 2021), a federal project’s engineering requirements required cast iron piping for the above ground sanitary system. However, the prime contractor installed PVC piping instead of cast iron piping. The prime contractor believed it had the appropriate approval through its submittal. The government, through its contracting officer, directed the prime contractor to remove installed PVC piping to replace with cast iron. The government did not believe PVC piping was the functional equivalent of cast iron piping for the above ground sanitary system due to its concern with the noise level of waste materials flowing through the piping. The prime contractor submitted a claim for its removal and replacement costs which was denied by the contracting officer. On appeal with the Armed Services Board of Contract Appeals, the Board agreed with the contracting officer explaining: “While we agree that a design change could be approved by the designer of record and brought to the attention of the government before being incorporated into the design documents, the [prime contractor’s] task order required that such a design change meet the minimum requirements of the solicitation and accepted proposal. The plumbing submittal [the prime contractor] issued here, showing the use of PVC instead of cast iron for the above ground waste piping, did not meet the minimum requirements of the solicitation.” Appeal of-Sauer, Inc., supra.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Congratulations to Partner Vik Nagpal on his Nomination for West Coast Casualty’s Jerrold S. Oliver Award of Excellence!
March 27, 2023 —
Dolores Montoya - Bremer Whyte Brown & O'Meara LLPBremer Whyte Brown & O’Meara, LLP is honored to share that Downtown San Diego and Encinitas Managing Partner Vik Nagpal is nominated for West Coast Casualty’s Jerrold S. Oliver Award of Excellence!
Every year, West Coast Casualty recognizes an individual who is committed, trustworthy, and has contributed to the betterment of the construction defect community. The award is named after the late Judge Jerrold S. Oliver who is considered a “founding father” in the alternate resolution process in construction claims and litigation. Each year, members of the construction community are asked to nominate individuals who invoke the same spirit as Judge Oliver.
Read the court decisionRead the full story...Reprinted courtesy of
Dolores Montoya, Bremer Whyte Brown & O'Meara LLP
Los Angeles Construction Sites May Be on Fault Lines
December 30, 2013 —
CDJ STAFFCalifornia law prohibits building near or on top of earthquake fault lines, but Los Angeles County building officials may have used outdated information that misreported the location of certain faults. The Los Angeles Times reports that after their earlier articles on fault lines, the officials have started using newer maps.
According to the older maps, an apartment building under construction on Brockton Avenue in Los Angeles is 1.9 miles away from the Santa Monica fault. But a more recent map, created by the state in 2010, shows that the fault line could potentially be right under the building site.
The builders of another apartment building potentially located on the Santa Monica fault said that the city did not ask for a fault investigation. The Los Angeles Department of Building and Safety said that there was no official zone designation for the Santa Monica fault, and so did not require seismic studies.
Read the court decisionRead the full story...Reprinted courtesy of
Home Prices in 20 U.S. Cities Increase at Slower Pace
February 25, 2014 —
Victoria Stilwell – BloombergHome prices in the U.S. climbed at a slower pace in the year through December, pointing to a moderation in the market that will help keep more properties within reach for prospective buyers.
The S&P/Case-Shiller index of property values in 20 cities rose 13.4 percent from December 2012 after increasing 13.7 percent in the year ended in November, the group said today in New York. It was the first deceleration since June. The gain matched the median estimate of 33 economists surveyed by Bloomberg.
Price appreciation is slowing as rising mortgage rates combined with harsh winter weather to cool home purchases over the past few months. Smaller increases mean more homes will remain affordable as the labor market improves, helping maintain the rebound in residential real estate that has boosted growth.
Read the court decisionRead the full story...Reprinted courtesy of
Victoria Stilwell, BloombergMs. Stilwell may be contacted at
vstilwell1@bloomberg.net
The Courts and Changing Views on Construction Defect Coverage
October 02, 2013 —
CDJ STAFFThere have been changes recently in how courts interpret commercial general liability policies. Writing for Claims Journal, Burke Coleman, who is legal counsel and Compliance Manager for Demotech, looks at five recent cases and how they show changing views of CGL policies and construction defect claims.
He notes that the Ohio Supreme Court concluded that “defective construction itself does not trigger coverage.” The court’s view in Westfield Ins. Co. v. Custom Agri Systems, Inc. was that a CGL policy does not protect contractors from every risk, but instead covers damage to other property that occur due to its work.
But, conversely, the Georgia Supreme Court found that construction defect claims could be covered under a commercial general liability policy, noting that “the limits of coverage do not have to be found in the word ‘occurrence,’ inasmuch as the other words of the insuring agreement — as well as the policy exclusions — have their own roles to play in marking the limits of coverage.” This decision was reached in Taylor Morrison Services v. HDI-Gerling America.
The Connecticut Supreme Court also concluded that defective construction could trigger coverage from a CGL policy, however, as Mr. Coleman notes, “only damage to non-defective property may be entitled to coverage.” He concludes that the North Dakota Supreme Court “has taken an even broader approach to the issue.” That court found that construction defects were covered “if the faulty work was unexpected and unintended.”
Finally, the Supreme Court of Appeals of West Virginia held that faulty work can be property damage. He notes “the policy at issue included a ‘your work’ exclusion that excluded coverage for work performed by the insured, but subcontractors were excepted from the exclusion.” However, another clause excluded work performed on the behalf of the insured.
Read the court decisionRead the full story...Reprinted courtesy of
Home insurance perks for green-friendly design (guest post)
February 04, 2014 —
Melissa Dewey Brumback – Construction Law in North CarolinaWondering how to get your residential clients to pony up more money for green design? Check out today’s guest post by Carrie Van Brunt-Wiley and Katherine Wood. They are writers for the Homeowners’ Insurance Blog, which serves as a resource center for insurance consumers and homebuyers across the country.
The U.S. Green Building Council’s new LEEDv4 standards present challenges for contractors, engineers, and architects – the restrictions in many cases are more stringent. There is, however an added bonus to remaining on the sustainable-building track: it’s more marketable than you think.
That’s because green homes don’t just appeal to buyers with environmental concerns any more. Now smart budgeters seek them out as well. Why? While it’s true that sustainable construction can cost about 2% more than conventional methods, McGraw-Hill’s Smart Market Report says it typically increases a building’s overall value by an average of 7.5% and improves the return on investment by 6.6%.
Read the court decisionRead the full story...Reprinted courtesy of
Melissa Dewey Brumback, Construction Law in North CarolinaMs. Brumback can be contacted at
mbrumback@rl-law.com
Useful Life: A Valuable Theory for Reducing Damages
March 29, 2017 —
Brooke E. Beebe, Esq. - Florida Construction Law NewsThe situation is one all too familiar to construction defect litigants. A homeowner contracts with a roofing contractor to install a new roof with a life expectancy of ten years.[1] After only five years, the homeowner brings a claim for construction defects in the roof alleging that the roof requires complete replacement due to water intrusion. The homeowner seeks damages for the full replacement cost of the roof. However, under a “useful life” theory, the homeowner would not be entitled to damages for the full amount of the replacement cost. Instead, the homeowner would be entitled to one-half of the cost of the replacement roof, taking into account the fact that he or she had been deprived of only five, rather than ten, years of use. “Useful life” is best understood as the expected length of time that a newly built construction element can be reasonably anticipated to last, subject to routine maintenance and ordinary wear and tear. The “useful life” theory holds that granting the homeowner damages for the full replacement cost of the roof would result in unjust enrichment to the homeowner, who had contracted for a roof with a ten-year, rather than a fifteen-year, useful life.
Read the court decisionRead the full story...Reprinted courtesy of
Brooke E. Beebe, Cole, Scott & Kissane, P.A.Ms. Beebe may be contacted at
brooke.beebe@csklegal.com
North Miami Beach Rejects as Incomplete 2nd Engineering Inspection Report From Evacuated Condo
July 25, 2021 —
Richard Korman - Engineering News-RecordNorth Miami Beach has rejected a new engineering inspection report provided by the Crestview Towers condominium association, keeping about 300 evacuated residents from returning to their apartments and raising new questions about engineering inspection reports in the aftermath of the Champlain Towers South collapse.
Reprinted courtesy of
Richard Korman, Engineering News-Record
Mr. Korman may be contacted at kormanr@enr.com