Garret Murai – California Construction Law BlogIt’s been the fodder of debate of philosophers, academics and the rest of us for ages:
- Do we have free will or are our actions predetermined and the result of preceding events?
- Are human beings fundamentally selfless or self preserving?
- Coca-Cola or Pepsi?
- iOs or android?
And for litigators and their clients, including us construction lawyers, arbitration or litigation? Or, in short, if a project goes sideways, in what forum will you resolve your dispute? It’s an important question the answer to which could mean the difference between winning or losing.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel Rosen Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
University of California Earthquake Report Provides List of Old Concrete Buildings in LA
January 22, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to a list provided to the city of Los Angeles by the University of California, there are “about 1,500 old concrete buildings that are potentially at risk of collapse during an earthquake,” the Los Angeles Times reported. The list can help the city identify “concrete buildings most likely to fail in an earthquake.”
The report, however, “does not amount to a list of dangerous buildings,” the university scientists told the Los Angeles Times. It is a list of concrete buildings built before 1980. Some of the “buildings are vulnerable, others are not.”
Concrete buildings pose a potentially dangerous threat, reported the Los Angeles Times: “After the Northridge earthquake caused two concrete buildings to collapse and severely damaged others, structural engineers warned that the collapse of a single concrete building ‘has the potential for more loss of life than any other catastrophe in California’ since the 1906 San Francisco earthquake.”
Eric Garcetti, Los Angeles Mayor, has asked Lucy Jones, a U.S. Geological Survey seismologist, to act as his science advisor on earthquake issues. Garcetti has asked Jones “to come up with recommendations by the end of the year on retrofitting issues, including how to get privately owned concrete buildings retrofitted.”
Read the court decisionRead the full story...Reprinted courtesy of
Home Buyers will Pay More for Solar
February 05, 2015 —
Beverley BevenFlorez-CDJ STAFFThe National Association of Home Builders’ (NAHB) Eye on Housing reported that a study’s results “found that homebuyers are willing to pay more for homes that have installed solar photovoltaic (PV) energy systems.” The team of researchers led by the U.S. Department of Energy’s Berkeley Laboratory “estimates a price premium of approximately $4 per watt of PV installed. For a typical PV system, the research team found that this translates into a price premium of $15,000.”
Furthermore, according to the NAHB, the study “suggests that the presence of energy-efficient home features is among the most important concerns for prospective home buyers.”
Read the court decisionRead the full story...Reprinted courtesy of
Competitive Bidding Statute: When it Applies and When it Does Not
April 15, 2024 —
Mason Fletcher - Ahlers Cressman & Sleight PLLCThe University of Washington (UW), a public university, aimed to secure a real estate developer for a new building on its campus. The proposal involved an 80-year ground lease (the “Lease”), and developers submitted bids. The selected developer would demolish an existing building, construct a new one, own it during the Lease at its own cost, and UW would lease back a portion, with ownership reverting to UW at the Lease’s end. Alexandria Real Equities, Inc. (ARE) was a finalist but ultimately was not selected, and the Lease was awarded to Wexford Science and Technology, LLC (Wexford). As a result, ARE filed suit against UW asserting three claims: 1) UW lacked authority to execute the Lease, 2) UW didn’t follow required competitive bidding procedures, and 3) UW’s developer selection process was arbitrary and capricious. None of these claims were successful and ARE appealed.
Division II of the Washington Court of Appeals affirmed in Alexandria Real Estate Equities Inc. v. Univ. of Wash., __ Wn. App. __, 539 P.3d 54 (2023), a published decision. The Court concluded, based on the facts in that case, that because construction was not publicly funded, UW did not have to follow competitive bidding requirements that were laid out in a statute relevant to state universities. Still, the Court applied the “bright-line cutoff point” that prohibits disappointed bidders from challenging an award once a contract has been executed. See Dick Enterprises, Inc. v. Metro. King County, 83 Wn. App. 566, 572, 922 P.2d 184 (1996).
Read the court decisionRead the full story...Reprinted courtesy of
Mason Fletcher, Ahlers Cressman & Sleight PLLCMr. Fletcher may be contacted at
mason.fletcher@acslawyers.com
California Supreme Court Adopts Vertical Exhaustion for Long-Tail Claims
June 15, 2020 —
Tred R. Eyerly - Insurance Law HawaiiIn another round of litigation involving coverage issues between Montrose Chemical Corporation and its insurers, the California Supreme Court ruled in favor of Montrose, adopting vertical exhaustion of excess policies. Montrose Chem. Corp. of Calif. v. The Superior Court of Los Angeles County, 9 Ca. 5th 215 (2020).
In 1990, the United States and the State of California sued Montrose for contamination from 1947 to 1982 caused by Montrose's facility manufacturing insecticides. Montrose had primary and excess liability policies from defendant insurers between 1961 and 1985. Forty insurers collectively issued more than 115 excess policies, which collectively provided coverage sufficient to indemnify Montrose's anticipate total liability.
Primary coverage was exhausted. Each excess policy provided that Montrose had to exhaust the limits of its underlying coverage before there would be excess coverage. Which excess carrier could be called on first was the issued before the California Supreme Court.
Montrose proposed a rule of "vertical exhaustion" or "elective stacking," whereby it could access any excess policy once it exhausted other policies with lower attachment points in the same policy period. The insurers, in contract, argued for "horizontal exhaustion," whereby Montrose could access an excess policy only after it exhausted other policies with lower attachment points from every policy period in which the environmental damage resulting in liability occurred.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Construction in Indian Country – What You Need To Know About Sovereign Immunity
July 22, 2019 —
Edward J. Hermes - Snell & Wilmer Under Construction BlogThere are many legal issues to consider when bidding on and building projects in American Indian Country. Which labor and employment laws apply? Are there contracting or hiring preferences that apply? Do the Prompt Pay Act and other state laws apply? Can I bring a lawsuit to enforce the contract and, if so, where would I file suit? This article addresses the final question, which is often the most important question when contracting with a tribal entity.
Many of the construction projects in American Indian Country are with tribes or entities wholly owned or by a tribe, such as housing authorities, casinos, hospitals, schools or other economic enterprises. Like the state and federal government, tribes (and their tribally—owned enterprises) enjoy sovereign immunity from any lawsuit, meaning they cannot be sued unless the tribe expressly agrees to waive its sovereign immunity. Sovereign immunity poses a unique issue for contractors that does not typically arise in other projects, but it need not be a deterrent to doing business with tribes. It is usually in the best interest of both the contractor and tribe to negotiate an acceptable waiver of sovereign immunity. Absent such a waiver, the tribe or tribal entity cannot be sued and the resulting forfeiture of remedies can be devastating for the contractor.
To waive sovereign immunity, the tribe must make it clear in the contract that it can be sued in a specific jurisdiction. Oklahoma Tax Comm'n v. Citizen Band Potawatomi tribe of Okla., 498 U.S. 505, 509 (1991). It does not matter whether the tribe is operating on or off its lands—if there is no express contractual waiver of sovereign immunity, a contractor will have no recourse in the event of non-payment or other breach of contract. See Kiowa tribe of Okla. v. Manufacturing Technologies, Inc., 523 U.S. 751, 118 S.Ct. 1700, 140 L.Ed.2d 981 (1998).
Read the court decisionRead the full story...Reprinted courtesy of
Edward J. Hermes, Snell & WilmerMr. Hermes may be contacted at
ehermes@swlaw.com
Flood Insurance Claim Filed in State Court Properly Dismissed
October 28, 2015 —
Tred R. Eyerly – Insurance Law HawaiiThe insureds' claim for flood coverage filed in state court was properly dismissed by the trial court. Rodriguez-Roble v. Am. Nat'l Prop. & Cas. Co., 2015 La. App LEXIS 1810 (La. Ct. App. Sept. 23, 2015).
The insureds' home was damaged by wind, rain and flood water during Hurricane Isac. The insureds provided to American National what they contended was satisfactory proof of their claim. American National failed to make any offers to resolve the claim.
The insureds sued in state court, seeking damages under the policy and penalties for American National's alleged bad faith in failing to settle or pay the claim. American National moved to dismiss, arguing that the state court did not have subject matter jurisdiction. American National further argued that under the National Flood Insurance Program, the federal courts had exclusive jurisdiction over the denial and adjustment of flood insurance claims. The trial court agreed that the flood insurance policy was governed by federal law.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Project-Specific Policies and Products-Completed Operations Hazard Extensions
May 31, 2021 —
Jeremiah M. Welch - Saxe Doernberger & Vita1. Understanding the “Products-Completed Operations Hazard”
ISO commercial general liability (“CGL”) policies use the term “products-completed operations hazard” (“PCOH”) to define a category of risk which is treated specially by certain exclusions within the policy and often subject to separate limits of insurance. In construction, we think about PCOH as being about coverage for completed work.
Bodily injury and property damage arising out of completed work is a significant construction risk. Most construction contracts include warranty and indemnity obligations for completed work. All states allow lawsuits to be brought alleging bodily injury or property damage because of completed work based on common law. Contract and common law claims are subject to statutes of limitation – laws which define the time in which suits must be brought. Most states provide exceptions to their statutes of limitation for common law claims – the most common example is an extension to file a lawsuit based on a latent defect until the defect is discovered. Most states also have “statutes of repose” – laws that set a date after which suit may no longer be brought, no matter what the circumstances are. A construction contractor, therefore, has potential liability until the statute of repose period has expired. Thus, a contractor looks to ensure that it has coverage for the PCOH for its full statute of repose liability period.
Read the court decisionRead the full story...Reprinted courtesy of
Jeremiah M. Welch, Saxe Doernberger & VitaMr. Welch may be contacted at