Sacramento Water Works Recognized as a Historic Civil Engineering Landmark
October 03, 2022 —
The American Society of Civil EngineersRESTON, Va. – The American Society of Civil Engineers (ASCE) Sacramento Section today recognized the City of Sacramento Water Works a Historic Civil Engineering Landmark. The landmark, which was completed in 1854, was recognized at a dedication ceremony at the Sacramento History Museum led by ASCE's Sacramento Section, which is celebrating its centennial anniversary of the Section's founding. The section was joined by Ken Rosenfield, director, ASCE Region 9 and Chuck Spinks, chair, Region 9 History and Heritage Committee.
ASCE represents more than 150,000 members of the civil engineering profession worldwide. It is the oldest national engineering society in the United States. ASCE recognizes historically significant civil engineering projects, structures, and sites all over the world. More than 280 projects have earned the prestigious title for creativity and innovation, and almost all are executed under challenging conditions.
The City of Sacramento Water Works was the first municipal, city-owned water system west of the Mississippi River. This project was inspired by a disastrous fire in 1852 that destroyed 27 blocks in Sacramento and the city did not have a water system capable of putting out fires. The water works site was equipped with a distribution system with hydrants that could fight fires.
The City of Sacramento Water Works was nominated by the ASCE Sacramento Section Centennial Committee. For more information about ASCE's Historic Civil Engineering Landmark Program, go to https://www.asce.org/about-civil-engineering/history-and-heritage/historic-landmarks.
ABOUT THE AMERICAN SOCIETY OF CIVIL ENGINEERS
Founded in 1852, the American Society of Civil Engineers represents more than 150,000 civil engineers worldwide and is America's oldest national engineering society. ASCE works to raise awareness of the need to maintain and modernize the nation's infrastructure using sustainable and resilient practices, advocates for increasing and optimizing investment in infrastructure, and improve engineering knowledge and competency. For more information, visit www.asce.org or www.infrastructurereportcard.org and follow us on Twitter, @ASCETweets and @ASCEGovRel.
Read the court decisionRead the full story...Reprinted courtesy of
As Some States Use the Clean Water Act to Delay Energy Projects, EPA Issues New CWA 401 Guidance
August 26, 2019 —
Anthony B. Cavender - Gravel2GavelIn just the past few weeks, three states have used their Clean Water Act 401 authority to delay, for an indefinite period, FERC-authorized pipeline expansion projects. On May 6, 2019, the Oregon Department of Environmental Quality denied, without prejudice, Jordan Cove’s application for a Section 401 water quality certification. Jordan Cove plans to build an LNG export terminal at Coos Bay, Oregon, if it can obtain the necessary federal and permits. Under Section 401(a) of the Clean Water Act, any applicant for a federal permit to conduct any activity, including the operation of facilities which may result in any discharge into the navigable waters, shall provide the permitting agency a certification from the State in which the discharge may originate that any such discharge will comply with the applicable provisions of the Clean Water Act, including effluent limitations and state water quality standards. The States have a “reasonable time”—which shall not exceed one year after the receipt of the 401 application—in which to act, or the state’s authority may be waived by this inaction. The Oregon DEQ concluded that Jordan Cove has not demonstrated that its project, as presently configured, will satisfy state water quality standards. The 401 applications submitted by Transcontinental Gas Pipe Line Co. (Transco) to the New Jersey Department of Environmental Protection and the New York State Department of Environmental Protection were similarly rejected without prejudice on May 15, 2019 (New York) and June 5, 2019 (New Jersey). This use of the states’ 401 authority has frustrated plans to build and operate LNG pipelines around the country.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Things You Didn't Know About Your Homeowners Policy
July 02, 2014 —
Arthur Murray – BloombergThink you know everything about your home insurance policy? Is that because you understand the difference between dwelling coverage and personal liability protection? Because you know that floods aren’t covered by standard home insurance?
Think again. You might know more than most, but you probably don’t know everything about your policy — unless you’ve read the fine print and committed it to memory. And who’s got time for that? However you don’t want to find yourself stuck without coverage you thought you had. Here are some lesser known coverage nuances you likely weren’t aware of.
Read the court decisionRead the full story...Reprinted courtesy of
Arthur Murray, Bloomberg
David M. McLain to Speak at the CLM Claims College - School of Construction - Scholarships Available
July 28, 2016 —
David M. McLain – Colorado Construction LitigationI am happy to have been asked to serve as an instructor at this year's CLM Claims College – School of Construction, to be held at the Marriott Baltimore Waterfront in Baltimore, Maryland on Wednesday, September 7, 2016 through Saturday, September 10, 2016.
Overview of the 2016 School of Construction
Construction claims present myriad complexities in claim handling. Construction defect lawsuits are often multi-party cases with cross claims and third-party claims between and among the numerous defendants. Insurance coverage is intertwined and complex due to the interplay of primary, excess, wrap, and additional insurers for the numerous defendants. All this is further complicated by statutes and regulations, inconsistent case law and procedural peculiarities throughout the United States. The economic stakes are high as the damages claims can be in the multi-millions.
Read the court decisionRead the full story...Reprinted courtesy of
David M. McLain, Higgins, Hopkins, McLain & Roswell, LLCMr. McLain may be contacted at
mclain@hhmrlaw.com
Checking the Status of your Contractor License During Contract Work is a Necessity: The Expanded “Substantial Compliance” under B&P 7031 is Here
June 05, 2017 —
Ivo G. Daniele – Newmeyer & Dillion LLP News AlertIt is paramount that a contractor diligently maintains its license prior to and during the performance of any contract work. Failure to do so could result in barring a contractor from receiving payment and/or disgorgement of profits received under the construction contract.
California Business and Professions Code section 7031 is part of the Contractors State License Law (Business & Prof. section 700 et seq.), and is both feared and loathed by all contractors performing work in the state of California. This draconian statute is known as the “Shield” and was enacted over 70 years ago for the singular purpose to bar all actions by contractors seeking compensation for unlicensed contract work – even precluding a contractor from enforcing his or her mechanic’s lien rights. However, a contractor could potentially avoid the harshness of B&P 7031 by establishing that he or she had substantially complied with the appropriate licensing requirements.
SUBSTANTIAL COMPLIANCE WITH LICENSE REQUIREMENTS PRIOR TO 2017 AMENDMENT
The substantial compliance exception is found in section B&P 7031(e), which authorizes the court to determine that there has been substantial compliance with licensure requirements, if the contractor has shown at an evidentiary hearing that he or she engaged in the unlicensed work had:
- Been duly licensed as a contractor in this state prior to the performance of the act or contract;
- Acted reasonably and in good faith to maintain the license;
- Did not know or reasonably should not have known that he or she was not licensed when he or she performed the work; and
- Acted promptly and in good faith to reinstate the license once it learned the license had lapsed.
Although not impossible, satisfying all four requirements of the exception was challenging for the contractor, specifically, requirement # (3) – the lack of knowledge that he or she was unlicensed during performance of work.
SUBSTANTIAL COMPLIANCE POST 2017
Fortunately, Governor Brown heard the collective cry for relief and signed Assembly Bill 1793 (“AB 1793”) into law. The new bill revises the criteria for the court to determine if a contractor is in substantial compliance with the licensing requirements by deleting requirement # (3) in its entirety and modestly amending requirement # (4) to require the contractor to act promptly and in good faith to remedy the failure to comply with the licensure requirements upon learning of the failure.
As a result, the substantial compliance exception under B&P 7031(e) reads as follows:
(e) The judicial doctrine of substantial compliance shall not apply under this section where the person who engaged in the business or acted in the capacity of a contractor has never been a duly licensed contractor in this state. However, notwithstanding subdivision (b) of Section 143, the court may determine that there has been substantial compliance with licensure requirements under this section if it is shown at an evidentiary hearing that the person who engaged in the business or acted in the capacity of a contractor
(1) had been duly licensed as a contractor in this state prior to the performance of the act or contract, (2) acted reasonably and in good faith to maintain proper licensure, and (3) acted promptly and in good faith to remedy the failure to comply with the licensure requirements upon learning of the failure.
This new legislation has tempered the burden of proof born by the contractor in establishing substantial compliance, although be it minor in its modification, the fact of the matter remains the same – be diligent in maintaining your license during all phases of contract work.
Ivo Daniele is a seasoned associate in the Walnut Creek office focusing his practice on commercial transactions and business and construction litigation. For questions regarding California Business and Professions Code section 7031, please feel free to contact Ivo Daniele at (925) 988-3222 or ivo.daniele@ndlf.com.
About Newmeyer & Dillion
For more than 30 years, Newmeyer & Dillion has delivered creative and outstanding legal solutions and trial results for a wide array of clients. With over 70 attorneys practicing in all aspects of business, employment, real estate, construction and insurance law, Newmeyer & Dillion delivers legal services tailored to meet each client’s needs. Headquartered in Newport Beach, California, with offices in Walnut Creek, California and Las Vegas, Nevada, Newmeyer & Dillion attorneys are recognized by The Best Lawyers in America©, and Super Lawyers as top tier and some of the best lawyers in California, and have been given Martindale-Hubbell Peer Review's AV Preeminent® highest rating. For additional information, call 949-854-7000 or visit www.ndlf.com.
Read the court decisionRead the full story...Reprinted courtesy of
You're Doing Construction in Russia, Now What?
May 16, 2022 —
Anazette Ray & Michael Vardaro - Zetlin & De Chiara LLPIn recent weeks, there has been a long list of companies, from all industries spanning from construction/engineering to fashion and hospitality, that have announced that they are completely severing ties with Russia, while a host of others have announced a temporary halt. See Jeffrey A. Sonnenfeld, Over 400 Companies Have Withdrawn from Russia – But Some Remain, Yale School of Management (Updated Mar. 21, 2022), https://som.yale.edu/story/2022/over-400-companies-have-withdrawn-russia-some-remain?utm_campaign=mb. For those developers, EPC contractors, and design professionals (engineers and architects) who have construction projects in Russia, the question is, “How should we proceed?”
The U.S. initially stated that it was not issuing a total embargo on business dealings and trade relations with Russia in response to the nation’s invasion of Ukraine. Instead, the U.S., along with many other Western nations, issued targeted sanctions. See Francesco Giumelli, Understanding Targeted U.N. Sanctions: An Empirical Analysis, International Affairs, 91(6), 1351-1368 (explaining the difference between embargoes and targeted sanctions). However, after evidence of war crimes by Russia emerged, President Biden issued an Executive Order prohibiting U.S. individuals, whether in the states or abroad, from new investments in Russia and prohibiting U.S. individuals from transactions with Russian state-owned entities. See April 6, 2022, Presidential Actions, https://www.whitehouse.gov/briefing-room/presidential-actions/2022/04/06/prohibiting-new-investment-in-and-certain-services-to-the-russian-federation-in-response-to-continued-russian-federation-aggression/. This new Executive Order is said to not affect existing contracts in Russia, but instead prohibits new ones.
Reprinted courtesy of
Anazette Ray, Zetlin & De Chiara LLP and
Michael Vardaro, Zetlin & De Chiara LLP
Ms. Ray may be contacted at aray@zdlaw.com
Mr. Vardaro may be contacted at mvardaro@zdlaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Anti-Concurrent Causation Clause Eliminates Loss from Hurricane
September 06, 2021 —
Tred R. Eyerly - Insurance Law HawaiiThe court found the insured was not covered for losses caused by Hurricane Laura due to the implementation of the policy's anti-concurrent causation clause. Aegis Sec. Ins. Co. v. Lejeune, 2021 U.S. Dist. LEXIS 106804 (W. D. La. June 7, 2021).
At the time of the hurricane, the insureds' home was covered by a manufactured home insurance policy issued by Aegis. The policy excluded coverage for damage "caused by, contributed to or aggravated by" flooding. The policy's anti-concurrent causation clause read, "We do not pay for loss to the types of property covered under this policy caused by any of the following. Such loss is excluded regardless of any other cause or event contributing concurrently or in any sequence to the loss." The policy's exceptions followed.
After the storm, the insureds submitted their claim. Aegis filed suit for declaratory judgment. Aegis relied upon reports that the manufactured home and barn owned by the insureds were damaged by winds, then displaced and destroyed by storm surge associated with the hurricane. The home first sustained damage from the storm's high winds before it was displaced from its concrete piers by a 12 to 16 foot storm surge.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Cuba: Construction Boom Potential for U.S. Construction Companies and Equipment Manufacturers?
June 30, 2016 —
Sanjo Shatley, Esq. – Florida Construction Law UpdateOn July 20, 2015, diplomatic relations were officially restored between the U.S. and Cuba. Since that date, a number of significant political events have taken place. First, the U.S. reopened its embassy in Cuba on August 14, 2015. Next, on January 26, 2016, offices of the U.S. Departments of the Treasury and Commerce announced new amendments to the Cuban Assets Control Regulations and Export Administration Regulations. These amendments removed “existing restrictions on payment and financing terms for authorized exports and reexports to Cuba of items other than agricultural items or commodities,” and established “a case-by-case licensing policy for exports and reexports of items to meet the needs of the Cuban people, including those made to Cuban state-owned enterprises.”[1] Additionally, these amendments “further facilitate travel to Cuba for authorized purposes by allowing blocked space, code-sharing, and leasing arrangements with Cuban airlines, authorizing additional travel-related and other transactions directly incident to the temporary sojourn of aircraft and vessels, and authorizing additional transactions related to professional meetings and other events, disaster preparedness and response projects, and information and informational materials, including transactions incident to professional media or artist productions in Cuba.”[2] Finally, on March 21, 2016, President Barack Obama was the first sitting U.S. President to visit Cuba since the 1959 revolution, in which Fidel Castro overthrew Fulgencio Batista. This revolution ultimately led to the U.S. severing diplomatic relations in 1961 and President John F. Kennedy imposing a trade embargo between the U.S. and Cuba, which remains in effect today.
Read the court decisionRead the full story...Reprinted courtesy of
Sanjo Shatley, Esq., Cole, Scott & Kissane, P.A.Mr. Shatley may be contacted at