Understanding the Details: Suing Architects and Engineers Can Get Technical
November 02, 2017 —
Steven M. Cvitanovic & Stephen M. Tye - Haight Brown & Bonesteel LLPBefore suing an architect or engineer for professional negligence, a plaintiff must obtain a “certificate of merit” (“Certificate”) under Code of Civil Procedure section 411.35. Boiled down to the basics, the Certificate declares that the attorney consulted with and received an opinion from an expert that a reasonable and meritorious case exists against said design professional. The Certificate must be filed before serving the complaint on any defendant, but can be filed within 60 days under certain circumstances. This rule was recently analyzed against another long-standing rule in California, known as the “relation-back doctrine.” Under the relation-back doctrine, a court will deem a later-filed pleading, such as an amended complaint, to be deemed filed at the time of an earlier complaint.
In Curtis Engineering Corp. v. Superior Court of San Diego County, No. D072046, (Cal. Ct. App. 10/23/17), the Fourth Appellate Court considered the interplay between section 411.35 and the relation-back doctrine, holding that a Certificate filed more than 60 days after filing the original pleading does not relate back to the filing of the original pleading.
Reprinted courtesy of
Steven Cvitanovic, Haight Brown & Bonesteel LLP and
Stephen Tye, Haight Brown & Bonesteel LLP
Mr. Cvitanovic may be contacted at scvitanovic@hbblaw.com
Mr. Tye may be contacted at stye@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
99-Year-Old Transmission Tower Seen as Possible Cause of Devastating Calif. Wildfire
December 11, 2018 —
Contra Costa Times - Engineering News-RecordDec. 08 --PULGA -- With winds gusting around 50 mph in the morning hours of Nov. 8 , portions of a PG&E steel lattice transmission tower -- exposed to the elements high on a ridgetop and originally built when Woodrow Wilson was president -- failed.
As high-voltage lines got loose and whipped around, striking the metal tower, molten aluminum and metal sprayed across tinder dry vegetation, igniting the brush. Arriving firefighters could only watch as the blaze underneath the power lines quickly spread to wild timber and brush.
Read the court decisionRead the full story...Reprinted courtesy of
Engineering News-RecordENR may be contacted at
ENR.com@bnpmedia.com
Rams Owner Stan Kroenke Debuts His $5.5 Billion Dream Stadium
September 14, 2020 —
Christopher Palmeri - BloombergThe first thing you notice that’s different about SoFi Stadium is that you can walk from the parking lot almost directly into the fifth level of the arena.
There’s no passing through gate after gate or ascending endless circular walkways. Construction workers dug up over 7 million cubic yards of dirt to build an arena that sits 100 feet (30 meters) below grade.
It’s one of the many features that make SoFi, the National Football League’s biggest stadium, surprisingly visitor-friendly. Not that fans will be able to experience it just yet. When the stadium debuts Sunday with the first game of the Los Angeles Rams’ season, it will be spectator-free -- the result of pandemic-spurred restrictions on gatherings. But it will still be a spectacle.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher Palmeri, Bloomberg
Court of Appeal Confirms Privette Doctrine as Applied to Passive Conduct of Property Owner
March 22, 2018 —
Bruce Cleeland and Frances Ma – Publications & InsightsIn
Delgadillo v. Television Center, Inc., 2018 No. B270985, the California Court of Appeal examined and refined the
Privette doctrine.
Mr. Delgadillo worked as a supervisor/window cleaner for a company named Chamberlin Building Services (CBS). Television Center, Inc. (TCI) purchased an existing building and thereafter contracted with CM Cleaning Solutions, Inc. (CMC) to provide cleaning and janitorial services. CMC, on behalf of TCI, solicited a proposal from CBS to wash the building’s windows. CBS and its employees made all decisions about how the window washing would be accomplished. The window washing equipment used on the job was owned, inspected and maintained by CBS. In violation of CBS’ policy, Mr. Delgadillo, attached a safety line to a single connector which was not an acceptable anchor point. The bracket failed and Mr. Delgadillo fell 50 feet to his death.
Survivors of Mr. Delgadillo filed suit against TCI for negligence and negligence per se, alleging that Mr. Delgadillo was fatally injured because TCI failed to install structural roof anchors, as required by several statutes.
Reprinted courtesy of
Bruce Cleeland, Haight Brown & Bonesteel LLP and
Frances Ma, Haight Brown & Bonesteel LLP
Mr. Cleeland may be contacted at bcleeland@hbblaw.com
Ms. Ma may be contacted at fma@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
2020s Most Read Construction Law Articles
January 25, 2021 —
ConsensusDocs2020 was . . . well . . . well it was memorable. Among many other things, construction was recognized as essential and ConsensusDocs published industry firsts in addressing prefabricated construction and lean for design-build, as well as 8 comprehensively revised performance and payment bonds. We also saw unprecedented readership of our construction law newsletter. As we celebrate the end of 2020 and wish you a happy new year, we continue a new a tradition of recognizing the below most read construction law articles of the year.
The ConsensusDocs Team.
5.
Level 10 Construction v. Sea World LLC: Can Force Majeure Save Sea World?
By:
Jamey B. Collidge Associate,
Troutman Pepper.
4.
The Designer’s Pre-bid Standard Of Care In A Design-Build Project
By:
Joshua A. Morehouse Associate,
Peckar & Abramson P.C. Read the court decisionRead the full story...Reprinted courtesy of
New York's Highest Court Says Asbestos Causation Requires Evidence Of Sufficient Exposure To Sustain Liability
May 10, 2022 —
Rafael Vergara & Jhonattan N. Gonzalez - White and WilliamsOn April 26, 2022, the New York Court of Appeals described that in toxic tort cases a plaintiff can only establish liability-creating causation for an adverse health effect with “expert testimony based on generally accepted methodologies.” See
Francis Nemeth v. Brenntag North America (N.Y. Apr. 26, 2022). The suit involved alleged asbestos exposure from talc.
The plaintiff alleged liability for talc contaminated with asbestos that was ultimately used in a commercial talcum powder, Desert Flower, which the decedent applied daily from 1960 to 1971. At trial, the plaintiff proffered two expert witnesses, a geologist, Sean Fitzgerald, who testified about the “glove box test” and a doctor of internal medicine, Dr. Jacqueline Moline. Fitzgerald’s glove box test consisted of agitating a sample of Desert Flower in a Plexiglas chamber. Fitzgerald concluded that the asbestos fibers in the sample of Desert Flower were “significantly releasable” and that the decedent was exposed to thousands to trillions of fibers through repeated use. Dr. Moline concluded Desert Flower was “a substantial contributing factor” to the decedent’s peritoneal mesothelioma. The jury returned a verdict in the plaintiff’s favor.
Reprinted courtesy of
Rafael Vergara, White and Williams and
Jhonattan N. Gonzalez, White and Williams
Mr. Vergara may be contacted at vergarar@whiteandwilliams.com
Mr. Gonzalez may be contacted at gonzalezj@whiteandwilliams.com
Read the court decisionRead the full story...Reprinted courtesy of
Sierra Pacific v. Bradbury Goes Unchallenged: Colorado’s Six-Year Statute of Repose Begins When a Subcontractor’s Scope of Work Ends
November 03, 2016 —
Luke Mecklenburg – Snell & Wilmer Real Estate Litigation BlogIt’s official: the October 20, 2016 deadline to petition for certiorari to the Colorado Court of Appeals on its decision in Sierra Pacific Industries, Inc. v. Bradbury has passed, so it appears that decision will stand.
In Sierra Pacific, the Court of Appeals held as a matter of first impression that the statute of repose for a general contractor to sue a subcontractor begins to run when a subcontractor’s scope of work is substantially complete, regardless of the status of the overall project. Sierra Pac. Indus., Inc. v. Bradbury, 2016 COA 132, ¶ 28, ___ P.3d ___. The Court of Appeals interpreted the statute of repose in C.R.S. section 13-80-104, which requires that “all actions against any architect, contractor, builder or builder vendor, engineer, or inspector performing or furnishing the design, planning, supervision, inspection, construction, or observation of any improvement to real property” must be brought within six years of substantial completion of that improvement. C.R.S. § 13-80-104(1)(a). Recognizing that “an improvement may be [to] a discrete component of an entire project” under Shaw Construction, LLC v. United Builder Services, Inc., 296 P.3d 145 (Colo. App. 2012), the Court of Appeals determined that “a subcontractor has substantially completed its role in the improvement at issue when it finishes working on the improvement.” Sierra Pac., 2016 COA at ¶¶ 20, 28. In doing so, it rejected Sierra Pacific’s argument that the statute could be tolled under the repair doctrine “while others worked to repair [the subcontractor’s] ‘improper installation work and flawed repair work.’” Id. at ¶ 29. Because six years had undisputedly passed since the subcontractor completed its scope of work when Sierra Pacific filed suit against it, the Court of Appeals affirmed the trial court’s order granting the subcontractor’s motion for summary judgment under Section 13-80-104(1)(a).
Read the court decisionRead the full story...Reprinted courtesy of
Luke Mecklenburg, Snell & Wilmer Real Estate Litigation BlogMr. Mecklenburg may be contacted at
lmecklenburg@swlaw.com
Kentucky Supreme Court Creates New “Goldilocks Zone” to Limit Opinions of Biomechanical Experts
July 24, 2023 —
Aimee E. Muller - Lewis BrisboisLexington, Ky. (June 26, 2023) – In a recent decision, the Kentucky Supreme Court placed stricter limitations on the opinions that biomechanical engineers may offer at trials in Kentucky courts. Specifically, the published opinion issued in Renot v. Securea, Supreme Ins. Co., 2023 Ky. LEXIS 163, recognizes a new space for the testimony of biomechanics experts – “The Goldilocks Zone.”
Where is the Goldilocks Zone?
The Goldilocks Zone is a perfect place in which the proffered testimony is neither too specific such that it wanders into the realm of medical causation, nor too general such that it fails to help a lay jury. Specifically, a biomechanical engineer’s expert testimony must be limited to the forces generated by the subject collision, the generally anticipated responses of a hypothetical person’s body to those forces, and the range of typical injuries resulting from such forces. Moreover, following Renot, a biomechanical engineer’s proffered opinions no longer may enter into the realm of diagnosing a specific medical condition associated with a traumatic injury. Instead, the question of whether a trauma actually caused or exacerbated a plaintiff’s injuries falls solely within the purview of a medical doctor.
Read the court decisionRead the full story...Reprinted courtesy of
Aimee E. Muller, Lewis BrisboisMs. Muller may be contacted at
Aimee.Muller@lewisbrisbois.com