Efficient Proximate Cause Doctrine Bars Coverage for Collapse of Building
July 31, 2013 —
Tred Eyerly, Insurance Law HawaiiThe court rejected the insured's argument that there was coverage for the collapse of a building caused by water leakage (a covered peril) and landslide (an uncovered peril). Stor/Gard, Inc. v. Strathmore Ins. Co., 2013 U.S. LEXIS App. 11015 (1st Cir. May 31, 2013).
A severe rain storm caused soil to slide down a hill and over a retaining wall, thereby damaging a building owned by the insured. Investigators hired by Strathmore Insurance Company determined that rain had soaked into the soil, causing the landslide. Although the investigators found some water leakage, they determined the leakage was not a cause or contributing factor, and was negligible compared to the rain amount.
The insured's policy with Strathmore was an all-risk policy. Loss caused by a landslide was excluded. Further, loss caused by collapse was excluded from coverage except as set forth in the policy's "additional coverage for collapse" section. This section provided coverage for a collapse caused by water damage or a leakage of water. Another exclusion barred coverage for loss caused by weather conditions.
Read the court decisionRead the full story...Reprinted courtesy of
Tred EyerlyTred Eyerly can be contacted at
te@hawaiilawyer.com
Homeowner's Claim for Collapse Survives Summary Judgment
September 20, 2017 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer failed to present adequate evidence on summary judgment that damage caused by the collapse of a swimming pool was not covered. Klein v. State Farm Ins. Co., 2017 N.Y. Misc. LEXIS 3030 (Sup. Ct. N.Y. July 11, 2017).
Klein notified State Farm that his in-ground pool collapsed on February 5, 2014, with a side wall falling into the pool, causing damage to brick, borders and the patio around the pool. Upon inspection, State Farm's agent found that the cover of the pool had partially fallen into the pool, and that the vinyl pool liner had a tear. State Farm covered the damage to the pool liner, but denied coverage for the in-ground swimming pool walls, the brick border and the patio surrounding the pool. State Farm maintained that the loss was due to a "collapse," which was excluded under the homeowner's policy.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Think Twice About Depreciating Repair Costs in Our State, says the Tennessee Supreme Court
July 09, 2019 —
Andres Avila - Saxe Doernberger & Vita, P.C.Tennessee’s Supreme Court recently held that an insurer may not withhold repair labor costs as depreciation when the policy definition of actual cash value is found to be ambiguous. Tennessee joins other states like California and Vermont that prohibit the depreciation of repair labor costs in property policies.
In Lammert v. Auto-Owners (Mut.) Ins. Co., No. M201702546SCR23CV, 2019 WL 1592687, the Lammerts and other insureds sought property damage coverage from Auto Owners Insurance for hail damage to a home and other structures they owned in Tennessee.
Auto-Owners Insurance agreed to settle the claims on an actual cash value basis (ACV), which is a method of establishing the value of insured property that must be replaced to determine the indemnity by the insurer. There are multiple methods to calculate ACV. Auto-Owners decided to use the ACV calculation method of deducting depreciation from the cost to repair or replace the damaged property. Depreciation is the decline in value of a property since it was new because of use, age or wear. The rationale behind this method is that an insured should not make a profit by recovering the cost of, for example, a new roof for a damaged roof that was ten years old, and thus depreciation is deducted from the indemnity.
Read the court decisionRead the full story...Reprinted courtesy of
Andres Avila, Saxe Doernberger & Vita, P.C.Mr. Avila may be contacted at
ara@sdvlaw.com
The Job is Substantially Complete, the Subcontract was Never Signed, the Subcontractor Wants to be Paid—Now What?
July 28, 2016 —
John P. Ahlers – Ahlers & Cressman PLLCA recent case in North Carolina illustrates the types of problems created when a general contractor accepts a subcontractor’s bid and then allows the subcontractor to perform the work without obtaining a signed subcontract.[i] In this case, the general contractor (Choate Construction Company – “Choate”) accepted a bid from a foundation subcontractor (Southeast Caissons, LLC – “SEC”). Choate sent the subcontract to SEC. SEC provided its changes in a “Proposed Addendum” to the subcontract stating, “[SEC] hereby accepts the terms of the attached Subcontract, subject to and conditioned upon Choate[’s] acceptance of the terms set forth in this Addendum[.]” After that, Choate called SEC and exchanged emails concerning the subcontract terms, but did not reach an agreement. SEC then performed its subcontract and sought payment, and acknowledged it had not signed the subcontract. Choate agreed it owed SEC something, but refused to pay because SEC did not have a signed subcontract, asserting the subcontract was not binding on Choate.
Read the court decisionRead the full story...Reprinted courtesy of
John P. Ahlers, Ahlers & Cressman PLLCMr. Ahlers may be contacted at
jahlers@ac-lawyers.com
Court Rules that Damage From Squatter’s Fire is Not Excluded as Vandalism or Malicious Mischief
April 15, 2015 —
Valerie A. Moore, Christopher Kendrick, and Colin T. Murphy – Haight Brown & Bonesteel LLPIn Ong v. Fire Insurance Exchange (No. B252773, filed 4/3/15), a California appeals court ruled that a vacancy exclusion limited to damage caused by “vandalism or malicious mischief” did not bar coverage for damage to a vacant property caused by a warming fire purposely started by a transient that got out of control and spread to other parts of the property.
In Ong, the insured’s rental premises had been vacated by tenants and the utilities turned off. Nearly two years later, the insured submitted a claim for fire damage that had just occurred. An investigator reported finding signs that a squatter had been living in the building, stating that: “[I]t appears the fire may have been initiated as the result of an uncontrolled warming fire started by an unauthorized inhabitant.” The investigator found firewood and a mattress, and concluded that holes burned in the floor were the result of the squatter attempting to throw burning wood out the door when the fire got out of control.
The policy excluded vandalism as follows: “We do not cover direct or indirect loss from: . . . 4. Vandalism or Malicious Mischief, breakage of glass and safety glazing materials if the dwelling has been vacant for more than 30 consecutive days . . . just before the loss. A dwelling under construction is not considered vacant.” The term “Vandalism” was not defined in the policy. The insurer denied coverage based on the exclusion, stating: “Our investigation indicates that this loss was the result of vandalism. A trespasser entered the vacant dwelling and intentionally set a fire on the kitchen floor.”
Reprinted courtesy of Haight Brown & Bonesteel LLP attorneys
Valerie A. Moore,
Christopher Kendrick and
Colin T. Murphy
Ms. Moore may be contacted at vmoore@hbblaw.com.
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Mr. Murphy may be contacted at cmurphy@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Seller Cannot Compel Arbitration for Its Role in Construction Defect Case<
March 01, 2012 —
CDJ STAFFThe buyer of a leaky home in Venice, California cannot be compelled to arbitration with the seller in a construction defect lawsuit, according to a decision in Lindemann v. Hume, which was heard in the California Court of Appeals. Lindemann was the trustee of the Schlei Trust which bought the home and then sued the seller and the builder for construction defects.
The initial owner was the Hancock Park Trust, a real estate trust for Nicholas Cage. Richard Hume was the trustee. In 2002, Cage agreed to buy the home which was being built by the Lee Group. Cage transferred the agreement to the Hancock Park Trust. Hancock had Richard Nazarin, a general contractor, conduct a pre-closing walk through. They also engaged an inspector. Before escrow closed, the Lee Group agreed to provide a ten-year warranty “to remedy and repair any and all damage resulting from water infiltration, intrusion, or flooding due to the fact that the door on the second and third floors of the residence at the Property were not originally installed at least one-half inch (1/2”) to one inch (1”) above the adjacent outside patio tile/floor on each of the second and third floors.”
Cage moved in and experienced water intrusion and flooding. The Lee Group was unable to fix the problems. Hume listed the home for sale. The Kamienowiczs went as far as escrow before backing out of the purchase over concerns about water, after the seller’s agent disclosed “a problem with the drainage system that is currently being addressed by the Lee Group.”
The house was subsequently bought by the Schlei Trust. The purchase agreement included an arbitration clause which included an agreement that “any dispute or claim in Law or equity arising between them out of this Agreement or any resulting transaction, which is not settled through mediation, shall be decided by neutral, binding arbitration.” The warranty the Lee Group had given to Hancock was transferred to the Schlei trust and Mr. Schlei moved into the home in May 2003.
Lindemann enquired as to whether the work done would prevent future flooding. Nazarin sent Schlei a letter that said that measures had been taken “to prevent that situation from recurring.” In February, 2004, there was flooding and water intrusion. Lindemann filed a lawsuit against the Lee Group and then added the Hancock Park defendants.
The Hancock Park defendants invoked the arbitration clause, arguing that Lindemann’s claims “were only tangentially related to her construction defect causes of action against the Lee Group.” On June 9, 2010, the trial court rejected this claim, ruling that there was a possibility of conflicting rulings on common issues of law. “With respect to both the developer defendants and the seller defendants, the threshold issue is whether there was a problem with the construction of the property in the first instance. If there was no problem with the construction of the property, then there was nothing to fail to disclose.” Later in the ruling, the trial court noted that “the jury could find there was no construction defect on the property, while the arbitration finds there was a construction defect, the sellers knew about it, and the sellers failed to disclose it.” The appeals court noted that while Hancock Park had disclosed the drainage problems to the Kamienowiczs, no such disclosure was made to Sclei.
The appeals court described Hancock Park’s argument that there is no risk of inconsistent rulings as “without merit.” The appeals court said that the issue “is not whether inconsistent rulings are inevitable but whether they are possible if arbitration is ordered.” Further, the court noted that “the Hancock Park defendants and the Lee Group have filed cross-complaints for indemnification against each other, further increasing the risk of inconsistent rulings.”
The court found for Lindemann, awarding her costs.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Testimony from Insureds' Expert Limited By Motion In Limine
October 21, 2015 —
Tred R. Eyerly – Insurance Law HawaiiThe court considered the scope of testimony to be offered by the insureds' expert regarding a policy written for sanitation districts. Binghamton-Johnson City Joint Sewage Bd. v. Am. Alternative Ins. Corp., 2015 U.S. Dist. LEXIS 112210 (N.D. N.Y. Aug. 25, 2015).
The city of Binghamton and the city's Sewage Board sued American Alternative Insurance Corporation (AAIC) for coverage for a collapsed wall. AAIC sought the limit to testimony of the insureds' expert, Paul B. Nielander, through a motion in limine.
AAIC argued that Nielander was not qualified as an expert in interpreting insurance policies. His knowledge and experience was limited to insurance practices in other states and the words contained in policies other than AAIC policies. He had no experience with (i) negotiating, drafting, or performing under an AAIC policy, (ii) handling claims or interpreting policies written in New York State, or (iii) drafting policies or otherwise participating in what he conceded was a "niche market" of providing insurance to sanitation districts. Further, Neilander was not qualified to offer expert analysis of when the structural failure of the wall occurred because he had no training or experience as an engineer.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Additional Insured Not Covered Where Injury Does Not Arise Out Of Insured's Work
April 15, 2015 —
Tred R. Eyerly – Insurance Law HawaiiThe court found the contractor did not have coverage as an additional insured under the subcontractor's policy. Walton Constr. v. First Fin. Ins. Co., 2015 US. Dist. LEXIS 30710 (E.D. La. March 12, 2015).
John Maestri was injured while working on a construction project for the Jefferson Parish School Board. Maestri was a commercial glazier for A-1 Glass Services Inc. A-1 was a subcontractor for Walton Construction. While Maestri was installing glass on the project, a high-voltage power line maintained by Entergy Louisiana, LLC electrocuted him, causing burns on his body.
Maestri sued Entergy. Entergy filed a third-party complaint against A-1 and Walton, alleging that the Louisiana Overhead Power Line Safety Act had been violated by failing to give advance notice that their workers would be working near the power lines. Entergy argued that under the statute, A-1 and Walton are liable for any damages that Entergy had to pay Maestri.