Warning! Danger Ahead for Public Entities
July 30, 2019 —
Michael J. Baker - Snell & Wilmer Under Construction BlogPublic entities are known to assert False Claims actions “to up the ante” to intimidate and aggressively address contractor construction claims. This strategy in the case of John Ross of Industrial Sheet Metal, Inc. (JRI) V. City of Los Angeles Department of Airports (LAWA), 29 Cal. App. 5th 378 (2018), backfired on the public entity, LAWA, in a big way and should serve as a warning to public entities about expanding claims to include False Claim actions. In this case, LAWA was awarded $1 in contract damages, its California False Claims Act (CFCA) claim was rejected by the jury as were JRI’s claims against LAWA. Despite losing on the substantive contract claims, the trial court found that JRI “prevailed in the action” under the relevant CFCA fee provision, Government Code 12652, subd. (g)(9)(B), regardless of JRI’s failure to prevail in the action as a whole. The California Appellate Court (hereinafter “Court”) affirmed the trial court’s finding.
The CFCA is analogous to the federal False Claims Act (FFCA; 31 U.S.C. 3729 et seq.). Since the CFCA is patterned on similar federal legislation, it was appropriate for the Court to look to precedent construing this similar federal act in interpreting the CFCA provisions. Accordingly, the Court looked at the False Claims Act cases for guidance in upholding the trial court’s decision in its determination that JRI was the “prevailing party” for determining an attorney’s fees award against LAWA.
Read the court decisionRead the full story...Reprinted courtesy of
Michael J. Baker, Snell & WilmerMr. Baker may be contacted at
mjbaker@swlaw.com
Federal Court Again Confirms No Coverage For Construction Defects in Hawaii
July 28, 2016 —
Tred R. Eyerly – Insurance Law HawaiiThe Hawaii federal district court confirmed its prior holdings that there is no duty to defend or indemnify for property damage caused by faulty workmanship. State Farm Fire & Cas Co. v. GP West, Inc., 2016 U.S. Dist. LEXIS 74240 (D. Haw. Jun 7, 2016). (Full disclosure - our office represents GP West in this matter).
GP West, the contractor, and Air Conditioning of Maui, Inc. (AC Maui), the subcontractor, were sued by the owner of a veterinary clinic for installation of an alleged defective HVAC system. GP West contracted with the owner to build the clinic. AC Maui was the HVAC subcontractor and designed, sized and priced a HVAC system for the clinic. The underlying complaint alleged that after the building was substantially complete, the HVAC system experienced multiple equipment defects and mechanical breakdowns, and did not properly dehumidify the building.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
St. Petersburg Florida’s Tallest Condo Tower Allegedly Riddled with Construction Defects
October 15, 2014 —
Beverley BevenFlorez-CDJ STAFFIn a new lawsuit, the Signature Place Condominium Association claims "it is spending ‘large sums' of money to repair problems ranging from cracks in exterior walls to improper fire wall installation to excessive noise from air-conditioning and heating systems,” according to the Tampa Bay Times.
The lawsuit also stated that “some of the alleged defects were hidden by building components and finishes and thus were not discovered by owners "until after the purchase and occupancy of the unit,” reported the Tampa Bay Times.
The association “seeks damages in excess of $15,000, cites more than 100 other alleged construction and design defects.”
Read the court decisionRead the full story...Reprinted courtesy of
BHA Has a Nice Swing: Firm Supports NCHV and Final Salute at 2017 WCC Seminar
May 03, 2017 —
CDJ STAFFBert L. Howe & Associates (BHA) is excited to announce the return of their very popular Sink a Putt for Charity at the 2017
West Coast Casualty Construction Defect Seminar. This year, participant’s efforts on the green will help benefit both the
National Coalition for Homeless Vets and
Final Salute. As in years past, sink a putt in the BHA golf challenge and win a $25 Amazon gift card, and for every successful putt made, BHA will make a $25 cash donation in the golfer’s name to be distributed equally between these two worthy organizations.
While at the booth, don’t forget to test out BHA’s industry leading data collection and inspection analysis systems. BHA has recently added video overviews to their data collection process, as well as next-day viewing of inspection data via their secured BHA Client Access Portal. Discover meaningful cost improvements that translate to reduced billing while providing superior accuracy and credibility. Also learn about BHA’s expanding market presence and full range of services in Texas, Florida, and across the Southeast United States.
Attendees can also enter to win Dodger baseball tickets or a new iPad Pro! Other BHA giveaways include USB charging blocks, pocket tape measures, multi-tools, LED flashlights, and foam stress balls.
For more information on the National Coalition for Homeless Vets, please visit: http://nchv.org/
To learn more about how Final Salute provides homeless women Veterans with safe and suitable housing, please visit: http://www.finalsaluteinc.org/
Read the court decisionRead the full story...Reprinted courtesy of
Replacement of Gym Floor Due to Sloppy Paint Job is Not Resulting Loss
January 02, 2024 —
Tred R. Eyerly - Insurance Law HawaiiThe court granted the insurer's motion for summary judgment finding damage to the gym floor due to a poor paint job was not a resulting loss. Bob Robinson Commercial Flooring, Inc. v. RLI Ins,. Co., 2023 U.S. Dist. LEXIS 196105 (D. Ark. Nov. 1, 2023).
Bob Robinson Commercial Flooring (BRCF) submitted a bid to the general contractor, Nabholz Construction Corporation, to install a vinyl athletic floor and striping at a middle school. The job also included the painting of a "Wildcat" logo the main gym floor. Therefore, BRCF's job was to install floors with proper painting and striping. Robert Liles and Robert Lines Parking Lot Services was the subcontractor hired to do the painting and striping. BRCF did not supervise or inspect Liles' work while it was ongoing.
Nabholz informed BRCF that there were problems with the floor painting, including crooked lines, incorrect markings, misplacement of the three point lines for the basketball surface, drips, smudges, etc. The gym floor was eventually rejected due to the nature of the vinyl flooring, once primer and paint were applied, the paint could not be removed and repainted. BRCF had to hire a new subcontractor to remove the flooring, install new flooring and then paint new lines. The cost for removal and replacement was $134,188.95.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Five Haight Attorneys Selected for Best Lawyers in America© 2021
September 07, 2020 —
Haight Brown & Bonesteel LLPFive Haight Brown & Bonesteel LLP attorneys were selected for Best Lawyers in America© 2021. Congratulations to William Baumgaertner, Bruce Cleeland, Peter Dubrawski, Michael Leahy and Denis Moriarty.
Since it was first published in 1983, Best Lawyers® has become universally regarded as the definitive guide to legal excellence. Best Lawyers lists are compiled based on an exhaustive peer-review evaluation. Almost 94,000 industry leading lawyers are eligible to vote (from around the world), and Best Lawyers has received over 11 million evaluations on the legal abilities of other lawyers based on their specific practice areas around the world. Lawyers are not required or allowed to pay a fee to be listed; therefore inclusion in Best Lawyers is considered a singular honor. Corporate Counsel magazine has called Best Lawyers “the most respected referral list of attorneys in practice.”
Read the court decisionRead the full story...Reprinted courtesy of
Haight Brown & Bonesteel LLP
Thoughts on New Pay if Paid Legislation
March 28, 2022 —
Christopher G. Hill - Construction Law MusingsRecently, the Virginia General Assembly closed its session having passed legislation essentially banning “pay if paid” clauses in construction contracts, both public and private. Assuming that Governor Youngkin signs the bill into law on or before his deadline of April 11, 2022, the following new requirement will be grafted into any Virginia construction contract:
Such contract shall require such higher-tier contractor to pay such lower-tier subcontractor within the earlier of (i) 45 days of the satisfactory completion of the portion of the work for which the subcontractor has invoiced or (ii) seven days after receipt of amounts paid by the owner to the general contractor or by the higher-tier contractor to the lower-tier contractor for work performed by a subcontractor pursuant to the terms of the contract.
This is the main operative language (the 45-day payment requirement is also applied to project owners), but the legislation also imposes certain other notice duties upon both the owner and any higher-tier contractor on a construction project. Interestingly, the legislation does not include a provision making it only effective for those contracts entered into after its effective date. More on that later.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Interpreting Insurance Coverage and Exclusions: When Sudden means Sudden and EIFS means Faulty
June 15, 2020 —
Ben Volpe - Colorado Construction Litigation BlogEIFS, or Exterior Insulation and Finish System, is an integrated exterior insulation and synthetic stucco system, praised for its energy efficiency.[1] However, EIFS has come to be well known in the construction defect world as placing homes at risk due to a lack of a built-in moisture management system. Before long, insurance companies recognized the risk and began explicitly excluding coverage for EIFS-related damage. However, EIFS exclusions have not always been so clearly set forth in some policies, causing insurance coverage litigation.
Recently, a Greenwood Village couple, Mark and Susan Mock, lost this fight.
Built in 1994, the Mocks’ home was constructed with an EIFS system. The Mocks carried a homeowner’s insurance policy through Allstate, which covered “sudden and accidental loss” to property, but excluded coverage for “planning, construction or maintenance” issues. Such “planning, construction or maintenance” exclusions included “faulty, inadequate or defective designs.”
A few months after a hailstorm, the Mocks discovered moisture-related damage to their home’s EIFS system. They reported the damage to Allstate, but Allstate would not cover it, reasoning that the damage to the EIFS system was excluded as a design and/or construction failure, and thus not covered as a “sudden and accidental” loss. The experts who evaluated the damage concluded it was the result of inherent flaws in the EIFS systems common in the 1994 timeframe, which involved long term moisture intrusion behind the cladding and no means for the water to escape.
Read the court decisionRead the full story...Reprinted courtesy of
Benjamin Volpe, Higgins, Hopkins, McLain & Roswell, LLCMr. Volpe may be contacted at
volpe@hhmrlaw.com