Occurrence Found, Business Risk Exclusions Do Not Bar Coverage for Construction Defects
May 13, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe court determined that the supplier of cement for the construction of pools had coverage for alleged construction defects in the finished pools. Harleysville Worcester Ins. Co. v. Paramount Concrete, Inc., 2014 U.S. Dist. LEXIS 43889 (D. Conn. March 31, 2014).
R.I. Pools sued Paramount, a manufacturer and supplier of shotcrete, after cracking appeared in nineteen pools built by R.I. Pools using Paramount's shotcrete. The jury awarded R.I. Pools compensatory damages of $2,760,000.
Paramount's insurer, Harleysville, defended under a reservation of rights. After the verdict, Harleysville filed for a declaratory judgment that there was no coverage under the CGL policy. Paramount filed for partial summary judgment.
Harleysville first argued there was no occurrence. The policy's definition of occurrence included the phrase, "continuous exposure." This broadened the term "occurrence" beyond the word accident to include a situation where damage occurred over a period of time, rather than suddenly or instantaneously.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Connecticut Supreme Court Rules Matching of Materials Decided by Appraisers
March 28, 2022 —
Tred R. Eyerly - Insurance Law HawaiiThe Connecticut Supreme Court determined that an appraisal panel could resolve whether the insurer must replace undamaged materials so that they match the damaged materials. Klass v. Liberty Mut. Ins. Co., 2022 Conn. LEXIS 2 (Conn. Jan. 11, 2022).
The insured reported damage to the roof of his home to Liberty Mutual. A representative from Liberty Mutual inspected and noticed a few shingles missing from the rear slope of the roof. The representative agreed that the damage was caused by wind damage, a covered loss under the policy. Liberty Mutual accepted coverage and issued an estimate to replace the rear slope of the roof. The insured's contractor inspected the roof and provided an estimate that contemplated replacement of the entire roof at nearly double the cost of Liberty Mutual's estimate.
The insured requested an appraisal. Liberty Mutual responded that the insured could not invoke the appraisal process in the absence of a "competing" estimate (i.e., one that addressed the claim for which coverage was accepted). Any dispute regarding the matching of the front and rear roof slope was a question of coverage, not an issue for appraisal.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Highest Building Levels in Six Years in Southeast Michigan
December 11, 2013 —
CDJ STAFFMacomb Township in southeast Michigan has had $122 million in new development in 2013, all of which helped the region reach its highest building levels since 2007. The wider area saw 398 permits issued for single-family homes in the last twelve months, fifty-two more than in the twelve months prior.
“The improvement is economically driven,” said Michael Stoskofa, the CEO of the Home Builders Association of Southeast Michigan. As employment improves in the area, “more people are willing and able to purchase a home,” he said. Home inventory in the area is also at a record low. As a result, projects that were put on hold in 2008 are active again.
Read the court decisionRead the full story...Reprinted courtesy of
Are You Taking Full Advantage of Available Reimbursements for Assisting Injured Workers?
January 08, 2019 —
Jonathan Schirmer - Ahlers Cressman & Sleight PLLCWorkplace injuries are an increasingly expensive cost of doing business. While every business does their best to avoid these injuries, even the most prepared employers must deal with them on occasion. The costs associated with these injuries—increased worker’s compensation premiums, decreased productivity, hiring temporary employees, and the loss of experienced workers—can be mitigated by shrewd employers taking full advantage of available assistance programs.
Read the court decisionRead the full story...Reprinted courtesy of
Jonathan Schirmer, Ahlers Cressman & Sleight PLLCMr. Schirmer may be contacted at
jonathan.schirmer@acslawyers.com
“I Didn’t Sign That!” – Applicability of Waivers of Subrogation to Non-Signatory Third Parties
September 30, 2019 —
Rahul Gogineni - The Subrogation StrategistIn Gables Construction v. Red Coats, 2019 Md. App. LEXIS 419, Maryland’s Court of Special Appeals considered whether a contractual waiver of subrogation in the prime contract for a construction project barred a third party – a fire watch vendor hired to guard the worksite – from pursuing a contribution claim against the general contractor. The court concluded that the general contractor could not rely on the waiver of subrogation clause to defeat the contribution claim of the vendor, who was not a party to the prime contract. As noted by the court, holding that a waiver of subrogation clause bars the contribution claims of an entity that was not a party to the contract would violate the intent of the Maryland Uniform Contribution Among Tortfeasors Act (UCATA).
When dealing with claims involving construction projects, there may exist multiple contracts between various parties that contain waivers of subrogation. The enforceability of such waivers can be limited by several factors, including the jurisdiction of the loss, the language of the waiver and the parties to the contract.
In Gables Construction, Upper Rock, Inc. (Upper Rock), the owner, contracted with a general contractor, Gables Construction (GCI) (hereinafter referred to as the “prime contract”), to construct an apartment complex. After someone stole a bobcat tractor from the jobsite, Gables Residential Services Incorporated (GRSI), GCI’s parent company, signed a vendor services agreement (VSA) with Red Coats to provide a fire watch and other security services for the project.
Read the court decisionRead the full story...Reprinted courtesy of
Rahul Gogineni, White and Williams LLPMr. Gogineni may be contacted at
goginenir@whiteandwilliams.com
City of Seattle Temporarily Shuts Down Public Works to Enforce Health and Safety Plans
April 13, 2020 —
Masaki J. Yamada - Ahlers Cressman & Sleight BlogThe Governor’s Stay Home, Stay Safe Order mandates that essential businesses must establish and implement social distancing and sanitation measures established by OSHA and the WA State DOH:
With construction work continuing on essential construction projects, some jurisdictions, such as the City of Seattle, are taking additional steps to enforce and oversee the establishment and implementation of updated Health and Safety plans on construction projects. The City of Seattle’s Mayor Jenny Durkan announced yesterday a two-day temporary suspension of Public Works construction beginning on Thursday, April 9th, to conduct health and safety training for workers and update protocols. The announcement may be viewed here. The City of Seattle also sent a letter in this regard and asked all contractors and owners provide project-specific responses to the Washington Building Trades COVID-19 Construction Industry Emergency Requirements. Herein are the links to the
letter and attached
requirements.
Read the court decisionRead the full story...Reprinted courtesy of
Masaki J. Yamada, Ahlers Cressman & SleightMr. Yamada may be contacted at
masaki.yamada@acslawyers.com
Business and Professions Code Section 7031, Demurrers, and Just How Much You Can Dance
February 14, 2022 —
Garret Murai - California Construction Law BlogFights between owners and contractors under Business and Professions Code section 7031 can get nasty and detailed. An owner’s remedy under Section 7031, as courts have stated, can be “harsh[ ],” “draconian” and even “unjust” and damages can be significant. Panterra GP, Inc. v. Superior Court, 2022 WL 289216 (2022), a case decided this past month, is no different. It even involved a disagreement between the very justices deciding the case.
The Panterra GP Case
Panterra GP, Inc. was a licensed general contractor. Rosedale Bakersfield Retail VI, LLC and Movie Grill Concepts XX, LLC intended to hire Panterra GP to perform renovation work at the Studio Movie Grill in Bakersfield, California, but drafted a construction contract mistakenly listing Panterra Development Ltd., LLP as the contractor on the project. Panterra GP was the general partner of Panterra Development.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Protect Against Design Errors With Owners Protective Professional Indemnity Coverage
March 14, 2018 —
Joseph Nawa – New Day Underwriting Managers, LLCPrior to the devastation caused by Hurricanes Harvey, Irma and Maria, the AIA Consensus Construction Forecast had predicted “slower growth for the construction industry for the remainder of 2017 and through 2018.” But, given the hundreds of billions of dollars in damages caused by these horrific events, Mark Zandi, chief economist at Moody's Analytics, estimates a lift to the economy through the rebuilding of these areas. This, of course, is dependent on insurer funds and the amount of aid offered through government sources.
Nonetheless, the process will be costly, timely and exhaustive. Under such circumstances, speed is a necessity. In addition to being drawn into the earliest stages of the project development cycle, the services of construction professionals have merged so intensely that even their “consultative advice” have produced exposures in “collaborative” environments rife with liability.
A challenge for contractors in today’s design/build marketplace is securing professional liability insurance policies that will not only manage the risks associated with their own errors and omissions, but also the problems caused by designers and others contracted to work on the project. However, this too is not very easy. Such policies when purchased by contractors can be exceedingly cost prohibitive.
Read the court decisionRead the full story...Reprinted courtesy of