Lewis Brisbois Successfully Concludes Privacy Dispute for Comedian Kathy Griffin Following Calif. Supreme Court Denial of Review
November 19, 2021 —
Lewis BrisboisLos Angeles, Calif. (October 18, 2021) - On October 13, 2021, the California Supreme Court declined to review a published, unanimous opinion of the Court of Appeal in favor of comedian Kathy Griffin and her husband, Randy Bick. The plaintiff-appellants claimed Ms. Griffin and Mr. Bick violated their privacy rights by using home security cameras to record “every move and every communication” in the plaintiffs’ private back yard.
Ms. Griffin and Mr. Bick maintained that the lawsuit was filed by their neighbors in retaliation after the husband directed what the Court of Appeal described as “an expletive-laden rant” at Ms. Griffin and Mr. Bick. The neighbor's rant was recorded by security cameras and reported in the media, as well as publicized during Ms. Griffin’s performances at the Dolby Theater.
In the trial court, Ms. Griffin and Mr. Bick successfully moved for summary adjudication of the plaintiffs’ privacy causes of action. In July 2021, the
Court of Appeal affirmed, calling the appellants’ claims “hyperbole.”
Read the court decisionRead the full story...Reprinted courtesy of
Lewis Brisbois
Effects of Amendment to Florida's Statute of Repose on the Products Completed Operations Hazard
November 06, 2018 —
Richard W. Brown & Grace V. Hebbel - Saxe Doernberger & Vita, P.C.Recent amendments to Florida’s Statute of Repose have resulted in concerns as to the scope of risk Florida homebuilders face as a result, and the availability of insurance coverage for such exposures. Previously, the statute provided for a strict, yet straightforward 10-year limitation for latent construction defect claims. Under that language, issues arose when suits were filed near expiration of the statute, because parties seeking to defend claims were given little time to effectively assert related claims. The amendment to the statute serves to lengthen the statute of repose to 11 years for certain cross-claims, compulsory counterclaims, and third-party claims, and in limited circumstances, potentially even longer. Most policies in the Florida marketplace serve to limit coverage under the products-completed operations hazard (“PCO”) to 10 years, and thus, in very limited circumstances, an insured contractor may be exposed to third-party claims under the revised statute. It is important to note, however, that coverage under most CGL policies is occurrence-based, meaning that the policy is triggered by property damage that occurs during the policy period, and therefore, any subsequent claims permitted under the amended statute will necessarily relate to the original property damage that occurred during the 10-year period, and thus, would be covered under the standard 10-year PCO extension. This paper will analyze the anticipated effect of the amendments upon coverage under a 10-year PCO extension.
Reprinted courtesy of
Richard W. Brown, Saxe Doernberger & Vita P.C. and
Grace V. Hebbel, Saxe Doernberger & Vita P.C.
Mr. Brown may be contacted at rwb@sdvlaw.com
Ms. Hebbel may be contacted at gvh@sdvlaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Pushing the Edge: Crews Carve Dam Out of Remote Turkish Mountains
July 04, 2023 —
Pam McFarland - Engineering News-RecordRugged Construction | Part Two of an ENR Series
On a cold, gray day in late March, the mountains on the drive to the Yusufeli hydroelectric dam project site in northeastern Turkey seem ominous.
With the highest of these rising more than 3,000 meters above sea level—some of them snow-capped—the jagged rock formations look stark and imposing, the type only a trained professional should attempt to cross.
Reprinted courtesy of
Pam McFarland, Engineering News-Record
Ms. McFarland may be contacted at mcfarlandp@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Identifying and Accessing Coverage in Complex Construction Claims
September 29, 2021 —
Jeffrey J. Vita & Michael V. Pepe - Saxe Doernberger & Vita, P.C.I. Introduction
First-party, third-party, builder’s risk, professional liability, commercial general liability, wrap-ups, and additional insured status are all potential sources of insurance coverage for a large construction loss. Therefore, it is critical for construction industry participants, from owners and developers to general contractors and their subcontractors, to have a functional knowledge of the different types of insurance coverage available to them and how those coverages intersect to respond to a loss. This paper presents a brief overview of the various types of coverage available to contractors, construction managers, and owners in a large construction loss and the risks each coverage is designed to insure.
In general, there are two forms of coverage: (1) First-party liability coverage, which protects an insured’s own losses on a project during construction; and (2) Third-party liability coverage, which insures the project participants for losses that become the subject of claims or suits brought against the project participants by third parties. When a loss occurs, such as property damage, both types of coverage can be implicated. For example, if a fire burns down a building under construction, the contractor likely would incur first-party losses such as cleanup costs. The contractor may also have third-party exposure if the owner alleges that the contractor was responsible for the fire. On the other hand, when a bodily injury occurs, all losses to the contractor will be third-party losses. A broad overview of each of these policies is provided below.
Reprinted courtesy of
Jeffrey J. Vita, Saxe Doernberger & Vita and
Michael V. Pepe, Saxe Doernberger & Vita
Mr. Vita may be contacted at JVita@sdvlaw.com
Mr. Pepe may be contacted at MPepe@sdvlaw.com
Read the court decisionRead the full story...Reprinted courtesy of
U.S. Department of Defense Institutes New Cybersecurity Maturity Model Certification
July 13, 2020 —
Joseph N. Frost - Peckar & AbramsonContractors doing business with the Federal Government, particularly with the Department of Defense (“DoD”), commonly handle sensitive information that is not intended to be disseminated. Controlled Unclassified Information (“CUI”) is one such type and is more specifically defined as “information that requires safeguarding or dissemination controls pursuant to and consistent with laws, regulations and government-wide policies.”1 Because some DoD contracts require contractors to handle CUI, certain safeguards have been put in place to ensure its security. This article briefly touches on the current cybersecurity protocols, followed by a discussion of the new system being developed by the DoD, and what contractors most need to know about the new system.
The Defense Federal Acquisition Regulation Supplement (“DFARS”) has long required contractors to comply with certain cybersecurity standards, as published by the National Institute of Standards and Technology (“NIST”). Specifically, DFARS sought to implement the cybersecurity framework found in NIST Special Publication (“SP”) 800-171, entitled “Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations.” NIST SP 800-171 sets forth fourteen (14) families of recommended security requirements for protecting the confidentiality of CUI in nonfederal systems and organizations, including, among others, access control, audit and accountability, incident response, personnel security, and system and information integrity. However, after a series of data breaches, the DoD reassessed the efficacy of the continued use of NIST SP 800-171 and ultimately decided to institute a new methodology to ensure the security of CUI.
Read the court decisionRead the full story...Reprinted courtesy of
Joseph N. Frost, Peckar & AbramsonMr. Frost may be contacted at
jfrost@pecklaw.com
Insurance Company’s Reservation of Rights Letter Negates its Interest in the Litigation
November 12, 2019 —
Frank Ingham - Colorado Construction LitigationThe Colorado Court of Appeals held that an insurance company, which issues a reservation of rights letter to its insured, loses its interest in the litigation, pursuant to C.R.C.P. 24(a)(2), when the insured settles the claims and assigns the bad faith action against the insurance company to the plaintiff. Bolt Factory Lofts Owners Association, Inc. v. Auto-Owners Insurance Company, 2019WL 3483901(Colo. App. 2019).
In a 2016 lawsuit in Denver District Court, 2016CV3360, the Bolt Factory Loft Owners Association, Inc. (“Association”) asserted construction defect claims against six contractors. Two of those contractors then asserted claims against other subcontractors, including Sierra Glass Co., Inc. (“Sierra Glass”). After multiple settlements, the only remaining claims were those the Association, as assignee of the two contractors, asserted against Sierra Glass.
Auto-Owners Insurance Company (“AOIC”) issued policies to Sierra Glass and defended it under a reservation of rights. The policy afforded AOIC the right to defend Sierra Glass, and it required Sierra Glass to cooperate in the defense of the legal action. The Association presented a settlement demand of $1.9 million to Sierra Glass, which AOIC refused to pay. To protect itself from an excess judgment that AOIC might not have paid, Sierra Glass entered into an agreement with the Association whereby Sierra Glass would refrain from offering a defense at trial and assign its bad faith claim against AOIC to the Association in exchange for the Association’s promise that it would not pursue recovery against Sierra Glass of any judgment entered against it at trial. Such agreements, known as Bashor or Nunn Agreements, are allowed in Colorado. Nunn v. Mid-Century Insurance Co., 244 P.3d 116 (Colo. 2010). Therefore, Sierra Glass was entitled to protect itself in the face of AOIC’s potential denial of coverage and refusal to settle. Bolt Factory Lofts, at ¶ 15.
Read the court decisionRead the full story...Reprinted courtesy of
Frank Ingham, Higgins, Hopkins, McLain & Roswell, LLCMr. Ingham may be contacted at
ingham@hhmrlaw.com
In Massachusetts, the Statute of Repose Applies to Consumer Protection Claims Against Building Contractors
January 28, 2019 —
Shannon M. Warren - The Subrogation StrategistIn Bridgwood v. A.J. Wood Construction, Inc., 105 N.E.3d 224 (Mass. 2018), the Supreme Court of Massachusetts determined that the statute of repose barred the plaintiff’s consumer protection claims commenced more than six years after the occurrence of the event that gave rise to the claims. In Bridgwood, the homeowner filed suit against the contractors who had performed renovations 15 years earlier. The homeowner asserted that concealed faulty electrical work caused a fire 11 years after the work was completed. The complaint alleged that the contractors, by violating Mass. Gen. Laws. Chapter 142A §17(10), committed an unfair and deceptive act pursuant to Mass. Gen. Laws Chapter 93A.
Section 17(10) prohibits contractors from violating building laws and specifically states that a violation of Section 17(10) constitutes an unfair and deceptive act as defined by Chapter 93A. Chapter 93A is regarded as one of the most stringent consumer protection statutory schemes in the nation, and allows litigants to seek remedies such as treble damages and attorney fees.
Read the court decisionRead the full story...Reprinted courtesy of
Shannon M. Warren, White and WilliamsMs. Warren may be contacted at
warrens@whiteandwilliams.com
Bertha – The Tunnel is Finished, but Her Legacy Continues
September 28, 2017 —
John P. Ahlers - Ahlers & Cressman PLLCThe Tunnel Boring Machine (“TBM”) known as “Bertha,” built by Hitachi Zosen Corp in Osaka, Japan, was the world’s largest TBM at 57.5 ft. in diameter. The TBM was built to drill the Seattle SR 99 Viaduct replacement tunnel. Seattle Tunnel Partners (“STP”) has a contract with the Washington State Department of Transportation (WSDOT) to dig the two-mile tunnel which is now complete.
In December of 2013, tunneling was stopped ostensibly because a 119 ft.-long, eight-inch diameter steel well casing halted the TBM. See 2/15 Blog “Bertha is Stuck and She Remains Mired in Controversy.” Reports are that WSDOT installed the pipe in 2002 to measure groundwater levels and the pipe was allegedly mentioned in the reference material provided to bidders. STP had assumed that the pipe had been removed until the steel casing got stuck in Bertha’s cutting teeth, halting progress. See 1/30/14 Blog “Big Bertha Stuck: Differing Site Condition Principles Revisited.” STP had a design-build contract with WSDOT. The contract contains a Differing Site Conditions (“DSC”) clause pursuant to which if the contractor can prove that the eight-inch pipe was an unforeseen condition (not disclosed in the contract documents), and that the unforeseen condition caused the TBM’s failure, STP is entitled to an equitable adjustment of its contract.
Read the court decisionRead the full story...Reprinted courtesy of
John P. Ahlers, Ahlers & Cressman PLLCMr. Ahlers may be contacted at
jahlers@ac-lawyers.com