Settlement Reached in Bridge Failure Lawsuit
December 11, 2013 —
CDJ STAFFOfficials claimed the failure of a bridge in Afton Township, Illinois was because trucks owned by Welded Construction used the bridge despite exceeding the bridge’s weight limit of 36.5 tons. The firm argued that they should be responsible for the depreciated cost of the bridge, not its replacement cost. Welded Construction had been using the bridge to get to the site of an oil pipeline construction project for Enbridge Energy.
Replacement of the bridge was initially estimated at $933,000, but that was in advance of any design work. Enbridge Energy settled the case at $900,000, which should cover most or all of the cost of repair or replacement. Some federal funds may also be available for repairing or constructing a new bridge.
Read the court decisionRead the full story...Reprinted courtesy of
Construction Calamity: Risk Transfer Tips for Contractors After a Catastrophic Loss
August 17, 2020 —
William S. Bennett - Saxe Doernberger & Vita, P.C.From structural collapses to fires, the construction industry has experienced a number of high-profile catastrophes over the past decade. These disasters test the mettle of even the most experienced risk professionals and the strongest insurance programs. Issues can arise in all facets of the company’s contracts and insurance policies, and dealing with the aftermath is an extensive and demanding process that can involve many players.
As overwhelming as the task may seem, however, it is possible for general contractors to get through the disaster with minimal uncovered exposure if proper steps are taken. By understanding some of the exposures a general contractor faces after a catastrophic loss and implementing key risk transfer strategies from the outset of a project, risk professionals can minimize the impact of a loss on the company in the short and long term.
Understanding Possible Risk Exposures
When a catastrophic loss occurs, contractors face a wide array of potential exposures. Unfortunately, many large catastrophic losses involve serious bodily injuries and even loss of life. If such a tragedy occurs, the general contractor can reasonably expect to be named in a flurry of personal injury and wrongful death lawsuits. Depending on the scope of the project and the area associated with the loss, the catastrophe may also prompt a wide range of bystander claims, from dust inhalation to emotional distress.
Read the court decisionRead the full story...Reprinted courtesy of
William S. Bennett, Saxe Doernberger & Vita, P.C.Mr. Bennett may be contacted at
wsb@sdvlaw.com
Comparing Contracts: A Review of the AIA 201 and ConsensusDocs - Part I
March 22, 2018 —
Michael Sams and Amanda Cox – Construction Executive, A publication of Associated Builders and Contractors. All Rights Reserved.Here’s a helpful comparison of and analysis of some important contract sections in the
AIA 201 (2007 and 2017 versions) and
ConsensusDocs (2014 and 2017 versions). While not intended to be all inclusive, this summary comparison of the contract documents will run as a three-part series. Part I covers Financial Assurances, Design Risk, Project Management and Contract Administration. Part II will cover Schedule/Time, Consequential Damages/LDs, Claims and Disputes/ADR. Part III will cover Insurance and Indemnification and Payment.
FINANCIAL ASSURANCES
- What assurances are there that the owner can pay for the project?
- The Contractor should have the right to request and obtain proof that the Owner has funding sufficient to pay for the Work. The provision should also provide that the Contractor may terminate the Contract if the Owner refuses to allow a review of funding documents, or should the Contractor reasonably determine that the Owner does not have sufficient funds to pay for the Work.
Relevant Sections:
- A201 2007 Section 2.2.1; 2017 Section 2.2.1-2.2.2 A201
- 2014 & 2017 ConsensusDocs 200: Section 4.2
AIA:
- Section 2.2.1 A201 2007 & 2017: Both editions require the Owner, upon Contractor’s written request, to provide, “reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Contract.” Thereafter, the Contractor may only request such evidence if (1) the Owner fails to make payments; (2) a change in the Work materially changes the Contract Sum; or (3) the Contractor identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. If the Owner does not comply, the Contractor may stop work.
- Additionally, A201 2017 Section 2.2.2 awards costs to the Contractor for demobilization and remobilization.
Reprinted courtesy of
Michael Sams , Kenney & Sams and
Amanda Cox, Kenney & Sams
Mr. Sams may be contacted at mpsams@KandSlegal.com
Ms. Cox may be contacted at ajcox@KandSlegal.com
Read the court decisionRead the full story...Reprinted courtesy of
SunCal Buys Oak Knoll Development for the Second Time
May 19, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to the San Francisco Business Times, “Irvine-based SunCal has now bought the same site twice: once in 2005 for $100.5 million and again last week from the Lehman Brothers estate.” Suncal’s original plan to develop the 167-acre Oakland Hills, California project “fell apart after Lehman declared bankruptcy in 2008.”
The San Francisco Business Times reported that the “former naval hospital site” has “the potential for more than 900 homes.” The former design included “960 homes, 82,000 square feet of commercial and retail space, and 50 acres of parks and open space.”
Read the court decisionRead the full story...Reprinted courtesy of
Insurer's Attempt to Strike Experts in Collapse Case Fails
February 03, 2020 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer's efforts to exclude two of the insured's experts in a collapse case were unsuccessful. Hudon Specialty Ins. Co. v. Talex Enterprises, LLC, 2019 U.S. Dist. LEXIS 150148 (S.D. Miss. Sept. 4, 2019).
The insureds' building collapsed. The remaining portions of the building required immediate stabilization. The insureds hired Mr. Laird, an engineer, to prevent further property destruction. The insured designated Mr. Laird as a non-retained expert for trial. Mr. Laird's report claimed that the collapse was caused because the building had been re-roofed many times without removal of the degraded underlying roofing materials, thereby adding additional weight to the roof structure.
The insureds also designated Steve Cox as a non-retained expert. Mr. Cox was an architect who owned property neighboring the building that collapsed. He opined that the building collapsed because of the condition of very old mortar and not because of water standing on the building roof or because of roof repairs.
Hudson sought to strike these two experts because their opinions were inconsistent with the admitted facts. A document produced by the insureds stated that a large amount of rainwater had collected on the roof and the weight of the rainfall was the proximate cause of the collapse. Hudson claimed that this statement qualified as a judicial admission, removing the question of causation from contention. The court disagreed that the statement was a judicial admission because it did not form any part of the pleadings. The statement may have been an evidentiary admission that could be controverted or explained by the parties.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
20 Years of BHA at West Coast Casualty's CD Seminar: Chronicling BHA's Innovative Exhibits
May 03, 2018 —
Beverley BevenFlorez-CDJ STAFFThe Bert L. Howe & Associates, Inc., (BHA) exhibit has been a fixture at West Coast Casualty's Construction Defect Seminar since the mid-1990's. Through the years, BHA has updated their display, but no matter what year, you could count on the BHA exhibit to provide a not-to-be-missed experience.
2008-BHA's sleek, rear projection display includes a screen that promotes the firm's capabilities that can be seen throughout the exhibit hall. This would be one of many innovations BHA has brought to the West Coast Casualty seminar.
2009-With the success of the rear screen projection, BHA adds additional monitors to provide attendees with more information about BHA.
2010-BHA adds an interpretive professional development exhibit targeted to Building Envelope issues allowing adjusters and other non-construction professionals hands on access to the systems and components at the heart of many related such claims.
2011-BHA's Swing for Charity challenge is born.
2012-Always innovating, BHA expands its rear projection and professional development offerings to West Coast attendees.
2013-BHA showcases additional capabilities with a twenty-four foot, custom, convex, immersive video experience.
2014-BHA adds an iPhone display to give a hands-on demonstration of their data collection methods.
2015-BHA's twenty-four foot , custom, convex, immersive video experience was elevated with two additional rear projection screens, reflecting BHA's newest capabilities and services.
2016-BHA dazzles attendees with their new exhibit comprised of more than 15 integrated, high definition, LCD displays. iPads are stationed on tables to conveniently demonstrate BHA's data collection processes.
2017-BHA's Swing for Charity Golf Challenge raised $2,225.00 for the National Coalition for Homeless Veterans and $1,900 for Final Salute.
Read the court decisionRead the full story...Reprinted courtesy of
Important Environmental Insurance Ruling Issued In Protracted Insurance-Coverage Dispute
May 16, 2018 —
Anthony B. Cavender - Gravel2Gavel Construction & Real Estate Law Blog The latest ruling in the long-running environmental insurance case, Olin Corporation v. Lamorak Ins. Co., was released on April 18, 2018, by Judge Rakoff of the U.S. District Court of the Northern District of New York. Judge Rakoff granted motions for summary judgment filed by Olin Corporation (Olin) and The London Market Insurers, and awarded Olin $55M for its claims against Lamorak Insurance Company (Lamorak).
As Judge Rakoff notes, “the overall litigation, having already outlived two federal judges, is now before the unlucky undersigned.” This ruling is in response to the Second Circuit’s most recent decision in Olin Corp. v. OneBeacon Americans Ins. Co.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, Pillsbury Winthrop Shaw Pittman LLPMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Insureds Survive Summary Judgment on Coverage for Hurricane Loss
June 19, 2023 —
Tred R. Eyerly - Insurance Law HawaiiThe magistrate judge recommended that the insurer's motion for summary judgment be denied, finding a material issue of fact regard the cause of loss after Hurricanes Laura and Delta. Armstrong v. Amguard Ins Co., 2023 U.S. Dist. LEXIS 76869 (E.D. Texas, April 14, 2023).
The policy excluded damage caused by wear and tear, differential foundation movement, as-built deficiencies, manual damage, and pre-existing conditions. Texas applied the doctrine of concurrence causes, meaning if damages were due to both covered and non-covered causes of loss, the insureds had to segregate the damage caused by covered causes of loss from the damage caused by non-covered causes of loss. Coverage was denied and the insureds filed suit.