At Long Last, the Colorado Legislature Gets Serious About Construction Defect Reform – In a Constructive Way
February 12, 2024 —
David McLain - Higgins, Hopkins, McLain & Roswell, LLCOn February 5th, Senators Zenzinger and Coleman, along with Representative Bird, introduced Senate Bill 24-106 into the Colorado Legislature. The bill has been assigned to the Senate Committee on Local Government and Housing. What follows are the various portions of the bill I believe to be the most impactful, as described in the bill summary, along with my commentary thereon:
Sections 3 and 6 – A True Right to Repair
Sections 3 and 6 create a right for a construction professional to remedy a claim made against the construction professional by doing remedial work or hiring another construction professional to perform the work. The following applies to the remedy:
- The construction professional must notify the claimant and diligently make sure the remedial work is performed; and
- Upon completion, the claimant is deemed to have settled and released the claim, and the claimant is limited to claims regarding improper performance of the remedial work.
Read the court decisionRead the full story...Reprinted courtesy of
David McLain, Higgins, Hopkins, McLain & Roswell, LLCMr. McLain may be contacted at
mclain@hhmrlaw.com
The Relevance and Reasonableness of Destructive Testing
August 17, 2017 —
David Adelstein - Florida Construction Legal UpdatesDestructive testing is a routine investigatory procedure in construction defect disputes. The destructive testing is necessary to determine liability (causation), the extent of damage, and the repair protocol. Destructive testing is designed to answer numerous questions: Why did the building component fail? Was the building component constructed incorrectly? What is the magnitude of the damage caused by the failure? What specifically caused the damage? What is the most effective way to fix the failure and damage? There are different iterations to the same questions, but in many instances, destructive testing is necessary to answer these questions.
Claimants sometimes prohibit destructive testing. Of course, destructive testing is intrusive. In many instances, it is very intrusive. But, this testing is a necessary evil. Without this testing, how can a defendant truly analyze their potential exposure and culpability? They need to be in a position to prepare a defense and figure out their liability. This does not mean destructive testing is warranted in every single construction defect dispute. That is not the case. However, to say it is never warranted is irrational.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
Dadelstein@gmail.com
Private Mediations Do Not Toll The Five-Year Prosecution Statute
April 28, 2016 —
Zachary P. Marks – Chapman Glucksman Dean Roeb & Barger In FocusIf you thought private mediation could toll the five-year period for case prosecution – think again. In a recent decision handed down by the Second District Court of Appeal, the court unequivocally held that voluntary, private mediations do not toll the five-year period before dismissal for failure to bring an action to trial.
California Code of Civil Procedure section 583.310 sets forth the applicable rule: “[a]n action shall be brought to trial within five years after the action is commenced against the defendant.” Section 1775.7(b) clarifies this rule, stating that the five-year period can be tolled if it is “submitted to mediation” within the final six months of the five-year period. However, the Code is silent with respect to the effect of tolling on public versus private mediations.
The Court of Appeal addressed this issue in its recent decision entitled Castillo v. DHL Express (USA) (2015) 243 Cal.App.4th 1186. Castillo was an employment class action brought by truck drivers against their employers. Plaintiffs argued that the case was “submitted to mediation” within the meaning of Section 1775.7(b) because the court’s Case Management Order reflected the fact that the parties agreed to pursue mediation. Conversely, defendants argued that the Case Management Statement clearly stated that the parties voluntarily agreed to a private mediation, not a court-ordered mediation.
Read the court decisionRead the full story...Reprinted courtesy of
Zachary P. Marks, Chapman Glucksman Dean Roeb & Barger In FocusMr. Marks may be contacted at
zmarks@cgdrblaw.com
CA Supreme Court Set to Rule on Important Occurrence Issue Certified by Ninth Circuit
March 22, 2018 —
William S. Bennett – SDV BlogThe California Supreme Court recently heard oral arguments over whether an insurer is required to cover allegations that a builder negligently failed to supervise an employee who sexually assaulted a middle school student while working at the student’s school. The question was originally certified to the California Supreme Court by the Ninth Circuit in 2016, but nothing happened until the court heard arguments on March 6, 2018.
Read the court decisionRead the full story...Reprinted courtesy of
William S. Bennett, Saxe Doernberger & Vita, P.C.Mr. Bennett may be contacted at
wsb@sdvlaw.com
Cal/OSHA’s Toolbox Has Significantly Expanded: A Look At Senate Bill 606
December 13, 2021 —
Michael J. Studenka - Newmeyer DillionGovernor Gavin Newsom recently signed into law Senate Bill 606, set to take effect on January 1, 2022. With proponents of the bill citing the need to hold large employers accountable for COVID-related workplace hazards, SB 606 creates two new categories of employer violations. First, SB 606 creates a rebuttable presumption that if a type of violation is discovered at one particular worksite, Cal/OSHA can extrapolate that the violation is an “enterprise-wide” violation at all of the other company worksites. Additionally, SB 606 adds a new category of “egregious violations” to Cal/OSHA’s arsenal, adding a penalty multiplier for such violations. Finally, SB 606 increases Cal/OSHA’s investigative capabilities by authorizing Cal/OSHA to issue a subpoena to employers should they fail to “promptly provide” information requested during an investigation. As further explained below, the consequences of violating Cal/OSHA regulations has become significantly greater and more expensive, particularly for larger employers with multiple worksites.
ENTERPRISE-WIDE VIOLATIONS AND THE SEVERE REMEDIES THAT FOLLOW
Under SB 606, employers with more than one worksite will now face a rebuttable presumption that a violation at one location is actually “enterprise-wide” if either of the following are true:
- A written policy or procedure violates any Cal/OSHA standard, rule, order or regulation; OR
- Cal/OSHA finds evidence of a “pattern or practice” of the same violation being committed by the employer at one or more of its worksites.
Read the court decisionRead the full story...Reprinted courtesy of
Michael J. Studenka, Newmeyer DillionMr. Studenka may be contacted at
michael.studenka@ndlf.com
Constructive Suspension (Suspension Outside of an Express Order)
December 13, 2022 —
David Adelstein - Florida Construction Legal UpdatesIn the federal procurement arena, there is a concept known as “constructive suspension.” Constructive suspension, while known in the federal arena, should reasonably apply to all projects when work is stopped outside of an express order to stop the work based on the law below. An unreasonable suspension is an unreasonable suspension and an express order to stop the work does not negate the effects of what really amounts to a suspension.
“Constructive suspension occurs when work is stopped absent an express order by the contracting officer and the government is found to be responsible for the work stoppage.” P.R. Burke Corp. v. U.S., 277 F.3d 1346, 1359 (Fed. Cir. 2002). The government delay must be unreasonable to support a constructive acceleration claim. Id.
“To demonstrate such a constructive suspension of work, the contractor must show that the delay (1) was for an ‘unreasonable length of time,’ (2) was proximately caused by the government’s actions, and (3) resulted in some injury to the contractor.” Fireman’s Fund Ins. Co. v. U.S., 2001 WL 36415627, *6 (Fed.Cl. 2001) (citation omitted). “Relative to proving that the delay was directly caused by the government, the contractor must concomitantly show that it was not delayed by any concurrent cause that would have independently generated the delay during the same time period even if it does not predominate over the government’s action as the cause of the delay.” Beauchamp Const. Co. v. U.S., 14 Cl.Ct. 430, 437 (Cl.Ct. 1988).
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
How a Maryland County Created the Gold Standard for Building Emissions Reduction
May 24, 2021 —
Pam McFarland - Engineering News-RecordMontgomery County, Md. is generating significant buzz among U.S. municipalities aiming to reduce greenhouse gas emissions from buildings.
Reprinted courtesy of
Pam McFarland, Engineering News-Record
ENR may be contacted at ENR.com@bnpmedia.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Not All Design-Build Projects are Created Equal
June 28, 2021 —
Nicole Markowitz & Richard Robinson - Peckar & Abramson, P.C.As the need for faster and more efficient construction increases, design-build agreements are growing in popularity. Design-build projects may account for 44% of nonresidential building in the United States this year. However, contractors who venture into a “design builder” role may unexpectedly become liable for design errors/omissions that are not covered by their insurance policies. In turn, they may expose themselves to liability and insurance risks that are neither insured nor managed.
In this article, we’ll discuss how the contractor who becomes a design-builder, or performs design-related work through subcontractors, faces potentially unmanaged risk. We will also explore indemnity, warranty, and insurance traps by paying attention to contract language in both traditional design-build and design-assist scenarios.
Reprinted courtesy of
Nicole Markowitz, Peckar & Abramson, P.C. and
Richard Robinson, Peckar & Abramson, P.C.
Ms. Markowitz may be contacted at nmarkowitz@pecklaw.com
Mr. Robinson may be contacted at rrobinson@pecklaw.com
Read the court decisionRead the full story...Reprinted courtesy of