Faulty Workmanship Causing Damage to Other Property Covered as Construction Defect
September 30, 2011 —
Tred R. Eyerly - Insurance Law HawaiiIn yet another recent construction defect case, the Illinois Court of Appeal found for coverage. See Milwaukee Mut. Ins. Co. v. J.P. Larsen, Inc., 2011 Ill. App. Ct. LEXIS 872 (Ill. Ct. App. Aug. 15, 2011).
Weather-Tite, Inc. hired Larson as a subcontractor to apply sealant to windows installed by Weather-Tite in a condominium building. The windows subsequently leaked and caused water damage. The homeowner’s association sued Weather-Tite for breach of express and implied warranties. Weather-Tite filed a third-party complaint against Larsen alleging that, if it was liable to the association for breach of warranty, Larsen was liable for contribution as a joint tortfeasor. Weather-Tite and Larsen both tendered defenses to Milwaukee Insurance. The tenders were denied and Milwaukee Insurance filed suit to determine rights under the policy.
Cross-motions for summary judgment were filed by all parties. The trial court granted Milwaukee Insurance’s summary judgment motion as to Weather-Tite, but granted Larsen’s cross-motion against Milwaukee Insurance.
On appeal, the appellate court considered whether the underlying pleadings alleged facts demonstrating "property damage" resulting from an "occurrence" within the terms of the policy.
Read the full story…
Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com
Read the court decisionRead the full story...Reprinted courtesy of
Avoiding Disaster Due to Improper Licensing
February 18, 2019 —
Candace Matson - Construction & Infrastructure Law BlogIT’S NOT ENOUGH FOR A CONTRACTOR TO BE LICENSED . . . it must be properly licensed.
We are reminded of this by the recent case of JMS Air Conditioning and Appliance Service, Inc. v. Santa Monica Community College District, Bernards Bros., Inc., 30 Cal. App. 5th 945 (2018). In that case, JMS entered into an $8.2M subcontract with Bernards to install an HVAC system in a new facility being built for the District. JMS held a C-20 warm-air heating, ventilating and air-conditioning license. A year into the project, Bernards sought permission from the District to substitute another subcontractor for JMS (as required under Public Contract Code Section 4107 for listed subcontractors on public works of improvement). Among other things, Bernards contended that JMS was not properly licensed to perform that portion of the work which consisted of hydronic plumbing and hydronic boiler work. JMS countered that this work was an integral part of installing an HVAC system, and relied on Business & Profession Code Section 7059, which permits work that is “incidental and supplemental to the performance of the work for which the specialty contractor is licensed,” and a California State Licensing Board regulation which defines “incidental and supplemental” as meaning “essential to accomplish the work in which the contractor is classified.” (Cal. Code Regs., tit. 16, §831.)
Read the court decisionRead the full story...Reprinted courtesy of
Candace Matson, Sheppard MullinMs. Matson may be contacted at
cmatson@sheppardmullin.com
Firm Sued for Stopping Construction in Indiana Wants Case Tried in Germany
October 16, 2013 —
CDJ STAFFGetrag Transmission, a German firm, is being sued by a Detroit-based construction firm that Getrag had hired to build a factory in Indiana. When a court gave the go-ahead to Walbridge Construction for the suit, Getrag appealed, stating that the case should be held in German so that Getrag officials do not have the expense of traveling to Indiana.
Getrag was building the plant, which would have cost $350 million, as part of a partnership with Chrysler. Chrysler dropped from the project after filing for bankruptcy. Shortly afterward, Getrag also filed for bankruptcy.
Walbridge is seeking $118.5 million due to expenses incurred with subcontractors. Chrysler has announced its intention of finishing the plant, which they estimate will cost about $162 million. Once complete, the plant will employ about 850 workers.
Read the court decisionRead the full story...Reprinted courtesy of
An Uncharted Frontier: Nevada First State to Prohibit Defense-Within-Limits Provisions
July 10, 2023 —
Geoffrey B. Fehling & Andrew S. Koelz - Hunton Insurance Recovery BlogNevada recently became the first state to prohibit defense-within-limits provisions in liability insurance policies. Defense-within-limits provisions—resulting in what’s called “eroding” or “wasting” policies—reduce the policy’s applicable limit of insurance by amounts the insurer pays to defend the policyholder against a claim or suit. These provisions are commonly included in errors and omissions (E&O), directors and officers (D&O) and other management liability policies. This is in contrast to other policies, most commonly commercial general liability policies, which provide defense “outside of limits” where defense costs do not reduce the policy’s limit.
Reprinted courtesy of
Geoffrey B. Fehling, Hunton Andrews Kurth and
Andrew S. Koelz, Hunton Andrews Kurth
Mr. Fehling may be contacted at gfehling@HuntonAK.com
Mr. Koelz may be contacted at akoelz@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
The Partial Building Collapse of the 12-Story Florida Condo
June 28, 2021 —
Beverley BevenFlorez – CDJ StaffOn Thursday, the Champlain Towers South Condo building in Surfside, Florida suffered a partial collapse. As of Monday morning, the official death toll stood at 10 with 151 persons unaccounted for, according to the Miami Herald.
NPR uncovered minutes from a November 15th, 2018 Chaplain Tower South Condominium Association board meeting where the inspector made assurances that “the building was ‘in very good shape.’” However, “an
engineering report from five weeks earlier” alleged “that failed waterproofing in a concrete structural slab needed to be replaced ‘in the near future.’” Daniella Levine Cava, the Miami-Dade County mayor, told reporters that “officials ‘knew nothing’ about the report.”
The New York Times on Sunday reported that experts looking at video footage of the incident believe that the cause is centered on a location “in the lowest part of the condominium complex — possibly in or below the underground parking garage — where an initial failure could have set off a structural avalanche.” The cause of the incident remains unclear, however. This “progressive collapse” could have been caused by a number of different factors “including design flaws or the less robust construction allowed under the building codes of four decades ago.”
A witness, according to the New York Times, saw a hole appear near the pool: “Michael Stratton said his wife, Cassie Stratton, who is missing, was on the phone with him and was looking out through the window of her fourth-floor unit when, she told him, the hole appeared. After that, the call cut off.”
Possible reasons for the “initial failure at the bottom of the building could include a problem with the deep, reinforced concrete pilings on which the building sits — perhaps set off by an unknown void or a sinkhole below — which then compromised the lower columns. Or the steel reinforcing the columns in the parking garage or first few floors could have been so corroded that they somehow gave way on their own. Or the building itself could have been poorly designed, built with substandard concrete or steel — or simply with insufficient steel at critical points.”
"It will take many months to complete the analysis necessary to understand the cause or causes of the collapse,” Eric Ruzicka, a partner at the international law firm Dorsey & Whitney and a commercial litigator who specializes in the area of construction and real estate litigation, stated in a media release. “Often, information that comes out early can be very misleading or misunderstood unless the full context of the information is known.”
Ruzicka explained that Florida’s statues of limitations and repose may be relevant. “These statutes will likely eliminate the liability of those involved in the original development, design and construction of the building. Rather, victims and their families' recovery will be limited to those involved in the building's maintenance and those assessing the condition of the building over the past four years.”
Miami and Sunny Isles Beach have announced they will audit older structures in their communities “ahead of the mandatory 40-year recertification,” the Miami Herald reported.
Read the full story (Miami Herald)...
Read the full story (NPR)...
Read the full story (NY Times)...
Read the court decisionRead the full story...Reprinted courtesy of
Four Companies Sued in Pool Electrocution Case
June 26, 2014 —
Beverley BevenFlorez-CDJ STAFFBack in April of this year, a seven-year old boy was electrocuted while swimming in his family’s pool in North Miami, Florida, according to CBS Miami. Now, the family is suing four companies in a wrongful death suit.
The complaint claims that the victim “was electrocuted due to a faulty pool light and electrical grounding and bonding on the pool’s lighting system.”
Pentair Water Pool and Spa, Inc., manufactured and designed the pool light. Florida Pool & Spa Center “provided periodic cleaning, maintenance and inspections of the pool,” while Gary B Electric and Construction Consultant is being sued for “improper bonding and grounding.” Also, Jorge Perez Enterprises Inspection Company is listed in the lawsuit since they conducted the inspection when the family purchased the home.
Read the court decisionRead the full story...Reprinted courtesy of
Analysis of the “owned property exclusion” under Panico v. State Farm
March 08, 2011 —
Colorado Construction LitigationThe U.S. Court of Appeals for the Tenth Circuit recently concluded that the “owned property exclusion” applied to bar coverage for claims of property damage. See Panico v. State Farm Fire and Cas. Co., 2011 WL 322830 (10th Cir. 2011). In Panico, the plaintiffs sold property in Aspen, Colorado to the Taylors, who sued the Panicos upon discovering the property was not as represented. After refusing to defend, the Panicos sued State Farm for breach of contract. The district court concluded that the Taylors’ claims were not covered under the Panicos insurance policies and granted summary judgment in State Farm’s favor. The U.S. Court of Appeals for the Tenth Circuit affirmed.
Mr. Panico built the house on the property as well as several additions to the house. As the Taylors lived in Florida, they primarily relied on their real estate agent and an inspector to ensure the property was acceptable. According to their complaint, the Taylors discovered that the house was “virtually uninhabitable due to serious design and construction defects, mold, rodents, and drainage problems.” Id. at *1. In their complaint, the Taylors asserted three claims for relief against the Panicos based upon misrepresentation and fraudulent concealment about the condition of the property.
Read the full story...
Reprinted courtesy of Heather M. Anderson of Higgins, Hopkins, McClain & Roswell, LLP. Ms Anderson can be contacted at anderson@hhmrlaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Collapse of Breezeway Attached to Building Covered
February 24, 2020 —
Tred R. Eyerly - Insurance Law HawaiiThe federal district court found that a breezeway that collapsed during a party was covered by the commercial property policy. DENC, LLC v. Philadelphia Indem. Ins. Co., 2019 U.S. Dist. LEXIS 179083 (M.D. N.C. Oct. 15, 2019).
DENC owned an apartment complex that was insured by Philadelphia under an all-risk policy. During an early morning party, a large number of students gathered on the second-floor breezeway for a party. The students started jumping in the breezeway when a certain song started playing. The floor abruptly collapsed underneath the students.
Philadelphia sent an adjuster to inspect the breezeway a couple days later. He wrote to Philadelphia that "the sole and proximate cause of the loss is water damage occurring over an extended period of time causing the second floor breezeway to sage and the light weight concrete to crack." Shortly thereafter, the building was condemned. A structural engineer found multiple ways in which water had seeped into the breezeway's wood framing and photographed the resulting biological growth and wood decay. He concluded that the building had sustained significant long-term water intrusion which resulted in the wood framing inability to support the loads. The water intrusion was caused by the failure to properly install a water management system on the walls, a properly integrated waterproof system for the walkway slab and framing configuration, and improper venting of dryers.
DENC retained an engineer who testified that the breezeway was sagging because the concrete had broken.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at