BERT HOWE
  • Nationwide: (800) 482-1822    
    retail construction building expert Seattle Washington condominiums building expert Seattle Washington office building building expert Seattle Washington custom home building expert Seattle Washington high-rise construction building expert Seattle Washington tract home building expert Seattle Washington landscaping construction building expert Seattle Washington Medical building building expert Seattle Washington housing building expert Seattle Washington industrial building building expert Seattle Washington structural steel construction building expert Seattle Washington institutional building building expert Seattle Washington townhome construction building expert Seattle Washington parking structure building expert Seattle Washington mid-rise construction building expert Seattle Washington concrete tilt-up building expert Seattle Washington hospital construction building expert Seattle Washington condominium building expert Seattle Washington low-income housing building expert Seattle Washington multi family housing building expert Seattle Washington Subterranean parking building expert Seattle Washington casino resort building expert Seattle Washington
    Seattle Washington civil engineering expert witnessSeattle Washington reconstruction expert witnessSeattle Washington construction safety expertSeattle Washington construction scheduling expert witnessSeattle Washington consulting general contractorSeattle Washington eifs expert witnessSeattle Washington construction forensic expert witness
    Arrange No Cost Consultation
    Building Expert Builders Information
    Seattle, Washington

    Washington Builders Right To Repair Current Law Summary:

    Current Law Summary: (SB 5536) The legislature passed a contractor protection bill that reduces contractors' exposure to lawsuits to six years from 12, and gives builders seven "affirmative defenses" to counter defect complaints from homeowners. Claimant must provide notice no later than 45 days before filing action; within 21 days of notice of claim, "construction professional" must serve response; claimant must accept or reject inspection proposal or settlement offer within 30 days; within 14 days following inspection, construction pro must serve written offer to remedy/compromise/settle; claimant can reject all offers; statutes of limitations are tolled until 60 days after period of time during which filing of action is barred under section 3 of the act. This law applies to single-family dwellings and condos.


    Building Expert Contractors Licensing
    Guidelines Seattle Washington

    A license is required for plumbing, and electrical trades. Businesses must register with the Secretary of State.


    Building Expert Contractors Building Industry
    Association Directory
    MBuilders Association of King & Snohomish Counties
    Local # 4955
    335 116th Ave SE
    Bellevue, WA 98004

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Kitsap County
    Local # 4944
    5251 Auto Ctr Way
    Bremerton, WA 98312

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Spokane
    Local # 4966
    5813 E 4th Ave Ste 201
    Spokane, WA 99212

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of North Central
    Local # 4957
    PO Box 2065
    Wenatchee, WA 98801

    Seattle Washington Building Expert 10/ 10

    MBuilders Association of Pierce County
    Local # 4977
    PO Box 1913 Suite 301
    Tacoma, WA 98401

    Seattle Washington Building Expert 10/ 10

    North Peninsula Builders Association
    Local # 4927
    PO Box 748
    Port Angeles, WA 98362
    Seattle Washington Building Expert 10/ 10

    Jefferson County Home Builders Association
    Local # 4947
    PO Box 1399
    Port Hadlock, WA 98339

    Seattle Washington Building Expert 10/ 10


    Building Expert News and Information
    For Seattle Washington


    The Right to Repair Act (Civ.C §895 et seq.) Applies and is the Exclusive Remedy for a Homeowner Alleging Construction Defects

    Pennsylvania Modernizes State Building Code

    Pennsylvania Finds Policy Triggered When Property Damage Reasonably Apparent

    Court of Appeals Rules that HOA Lien is not Spurious, Despite Claim that Annexation was Invalid

    French President Vows to Rebuild Fire-Collapsed Notre Dame Roof and Iconic Spire

    Bay Area Firm Offers Construction Consulting to Remodels

    Palo Alto Proposes Time Limits on Building Permits

    In Search of Cement Replacements

    Multifamily Building Pushes New Jersey to Best Year since 2007

    Are Construction Defect Claims Covered Under CGL Policies?

    Rams Owner Stan Kroenke Debuts His $5.5 Billion Dream Stadium

    Is Your Website Accessible And Are You Liable If It Isn't?

    Foreclosures Decreased Nationally in September

    Understanding the Details: Suing Architects and Engineers Can Get Technical

    Ruling Closes the Loop on Restrictive Additional Insured Endorsement – Reasonable Expectations of Insured Builder Prevails Over Intent of Insurer

    Los Angeles Warehousing Mecca Halts Expansion Just as Needs Soar

    Homeowner Has No Grounds to Avoid Mechanics Lien

    Issue and Claim Preclusion When Forced to Litigate Similar Issues in Different Forums: White River Village, LLP v. Fidelity and Deposit Company of Maryland

    Locating Construction Equipment with IoT and Mobile Technology

    Leaning San Francisco Tower Seen Sinking From Space

    Housing Starts in U.S. Beat 1 Million Pace for Second Month

    America’s Infrastructure Gets a D+

    Insurer Prevails on Summary Judgment for Bad Faith Claim

    Construction Defect Scam Tied to Organized Crime?

    Best Lawyers Recognizes Twelve White and Williams Lawyers

    Flood Insurance Claim Filed in State Court Properly Dismissed

    When Must a New York Insurer Turn Over a Copy of the Policy?

    Ohio Court Finds No Coverage for Construction Defect Claims

    Insurer Must Cover Construction Defects Claims under Actual Injury Rule

    Contractor Liable for Soils Settlement in Construction Defect Suit

    You Can Now Build a Multi-Million Dollar Home via Your iPad

    Emerging World Needs $1.5 Trillion for Green Buildings, IFC Says

    Downtown Sacramento Building Riddled with Defects

    How the New Dropped Object Standard Is Changing Jobsite Safety

    Federal Subcontractor Who Failed to Follow FAR Regulations Finds That “Fair” and “Just” are Not Synonymous

    Traub Lieberman Partner Stephen Straus Wins Spoliation Motion in Favor of Defendant

    California Team Secures Appellate Victory on Behalf of Celebrity Comedian Kathy Griffin in Dispute with Bel Air Neighbor

    Commencing of the Statute of Repose for Construction Defects

    Texas Federal Court Delivers Another Big Win for Policyholders on CGL Coverage for Construction-Defect Claims and “Rip-and-Tear” Damages

    West Coast Casualty’s 25th Construction Defect Seminar Has Begun

    No Friday Night Lights at $60 Million Texas Stadium: Muni Credit

    Super Lawyers Selects Haight’s Melvin Marcia for Its 2023 Northern California Rising Stars List

    Disappointment on an Olympian Scale After Rio 2016 Summer Games

    Combating Climate Change by Reducing Embodied Energy in the Built Environment

    An Insurance Policy Isn’t Ambiguous Just Because You Want It to Be

    Traub Lieberman Attorneys Recognized as 2022 Illinois Super Lawyers® and Rising Stars

    OH Supreme Court Rules Against General Contractor in Construction Defect Coverage Dispute

    New FAR Rule Mandates the Use of PLAs on Large Construction Projects

    Speculative Luxury Homebuilding on the Rise

    Ohio Court of Appeals: Absolution Pollution Exclusion Bars Coverage for Workplace Coal-Tar Pitch Exposure Claims
    Corporate Profile

    SEATTLE WASHINGTON BUILDING EXPERT
    DIRECTORY AND CAPABILITIES

    The Seattle, Washington Building Expert Group at BHA, leverages from the experience gained through more than 7,000 construction related expert witness designations encompassing a wide spectrum of construction related disputes. Drawing from this considerable body of experience, BHA provides construction related trial support and expert services to Seattle's most recognized construction litigation practitioners, commercial general liability carriers, owners, construction practice groups, as well as a variety of state and local government agencies.

    Building Expert News & Info
    Seattle, Washington

    First-Party Statutory Bad Faith – 60 Days to Cure Means 60 Days to Cure

    October 19, 2020 —
    In a first party bad-faith lawsuit, such as a bad faith claim against an insured’s property insurer, there are three requirements that must be met before the bad faith lawsuit is filed: “‘(1) determination of the insurer’s liability for coverage; (2) determination of the extent of the insured’s damages; and (3) the required notice must be filed under section 624.155(3)(a).’” Fortune v. First Protective Ins. Co., 45 Fla. L. Weekly D2092a (Fla. 2d DCA 2020) (citation omitted). The third requirement is for the insured to file a Civil Remedy Notice (known as a “CRN”) as a condition precedent to filing a statutory bad faith lawsuit giving the insurer 60 days’ notice of the bad faith violation and to cure the violation, i.e., pay the claim if the violation is payment. A very common bad faith payment violation is the assertion that the insurer did NOT attempt “in good faith to settle claims when, under the circumstances, it could and should have done so, had it acted fairly and honestly towards its insured and with due regard for his or her interests.” Fla. Stat. s. 624.155(1)(b)(1). Read the court decision
    Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris, P.A.
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Ensuing Losses From Faulty Workmanship Must be Covered

    May 10, 2012 —

    Coverage for damages resulting from faulty workmanship in the construction of an apartment complex was at issue in The Bartram, LLC v. Landmark Am. Ins. Co., 2012 U.S. Dist. LEXIS 44535 (N.D. Fla. March 30, 2012).

    The owner of the apartments, Bartram, had primary coverage and three layers of excess coverage. Each contract excluded loss from faulty workmanship. The policies provided, however, "if loss or damage by a Covered Cause of Loss results, we will pay for that resulting loss or damage."

    Bartram contended water intrusion occurred because of faulty workmanship, which caused damage to the buildings’ exterior and interior finishes, wood sheathing, framing, balcony systems, drywall ceilings and stucco walls. This damage was separate from the work needed to simply fix the faulty workmanship. Therefore, Bartram argued, the ensuing losses that resulted from the water intrusion was covered.

    The insurer argued the ensuing loss exception was not applicable if the ensuing loss was directly related to the original excluded loss.

    Read the full story…

    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com

    Read the court decision
    Read the full story...
    Reprinted courtesy of

    Gone Fishing: Tenant’s Insurer Casts A Line Seeking To Subrogate Against The Landlord

    October 17, 2022 —
    In J&J Fish on Ctr. Str., Inc. v. Crum & Forster Specialty Ins. Co., No. 20-cv-644-bhl, 2022 U.S. Dist. LEXIS 16361, the United States District Court for the Eastern District of Wisconsin (District Court) recognized that “[t]here will be no further fish fries on Center Street until someone pays to repair the collapsed floor at J&J Fish on Center Street, Inc. (J&J Fish).” The contenders were: 1) J&J Fish; 2) its’ insurer, Crum & Forster Specialty Insurance Company (Insurer); and 3) J&J Fish’s landlord, Vision Land, LLC (Vision). Recognizing Insurer’s right to subrogate against Vision based on the terms of the parties’ lease, the District Court held Insurer owed J&J Fish coverage for the losses it sustained, but that Insurer could subrogate against Vision for anything it had to pay J&J Fish. In J&J Fish, Vision and J&J Fish signed a lease (Lease) for a building (the Building) located in Milwaukee, Wisconsin. The Lease required Vision to “purchase and keep in full force and effect on the building(s) . . . insurance against fire and such other risks as may be included in all-risks policies . . .” Vision, however, never obtained any insurance on the Building. Pursuant to the Lease, Vision also agreed to “maintain and repair the structure including the slab floor and exterior walls of the Premises.” With respect to J&J Fish, the Lease required J&J Fish to maintain “Physical Damage insurance, including but not limited to fire . . . and all other risks of direct physical loss as insured . . . for the full replacement cost of all additions, improvements (including leasehold improvements) and alterations to the Premises.” J&J Fish purchased a commercial property and casualty insurance policy (the Policy) from Insurer. The Policy covered “additions, improvements . . . and alterations” as the Lease required. In addition, it insured the Building itself against “collapse,” subject to certain exceptions. Read the court decision
    Read the full story...
    Reprinted courtesy of William L. Doerler, White and Williams LLP
    Mr. Doerler may be contacted at doerlerw@whiteandwilliams.com

    Defects, Delays and Change Orders

    November 01, 2021 —
    As every construction professional is aware, unexpected events and problems are guaranteed on every large project. Defects, delays and change orders are sure to arise, and depending on how they are dealt with and addressed at the time, they can either have minimal effects on the overall project or they can have drastic, long-term and often costly effects, including but not limited to thousands of dollars in legal fees, increases in insurance premiums and/or years of litigation down the road. There are many reasons why so many large construction projects end up in some type of litigation. Delay claims, construction contract disputes and construction defect lawsuits are so prevalent in certain parts of the country that certain judges designate specific time blocks in their courtrooms for construction cases only—just to deal with the large portions of their case dockets dealing with construction issues at the same time. Reprinted courtesy of Jacob A. Epstein, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the court decision
    Read the full story...
    Reprinted courtesy of
    Mr. Epstein may be contacted at jepstein@haber.law

    NTSB Issues 'Urgent' Recommendations After Mass. Pipeline Explosions

    November 28, 2018 —
    The National Transportation Safety Board has issued urgent safety recommendations in the wake of September’s natural-gas explosions and fires in the Merrimack Valley area of Massachusetts that killed one person and resulted in at least 21 others, including two firefighters, going to the hospital. Read the court decision
    Read the full story...
    Reprinted courtesy of Tom Ichniowski, ENR
    Mr. Ichniowski may be contacted at ichniowskit@enr.com

    Delaware River Interstate Bridge Shut to Assess Truss Fracture

    January 26, 2017 —
    The Delaware River Bridge, which runs between Pennsylvania and New Jersey, was shut down indefinitely over the Jan. 22-23 weekend, after a large fracture was discovered in the bridge that connects the turnpikes of the two states. The fracture on a steel truss below the bridge deck on the Pennsylvania side was discovered during a routine check as part of a painting operation. Steel plates were installed to temporarily reconnect the fracture and stabilize the 1.5-mile bridge, which is located in Bucks County on I-276 and accommodates 42,000 vehicles a day. As engineers assess how the damage will impact the entire bridge, a sample from the fractured truss was sent to a forensic lab to determine the cause of the crack. A high-definition video survey is being used to monitor the bridge. Read the court decision
    Read the full story...
    Reprinted courtesy of Justin Rice, ENR
    Mr. Rice may be contacted at ricej@enr.com

    Revisiting OSHA’s Controlling Employer Policy

    December 21, 2017 —
    The United States Court of Appeals for the 5th Circuit has been asked to review OSHA’s twenty year old “controlling employer” policy. As many contractors are surprised to learn, under OSHA’s controlling employer policy, you can be given an OSHA citation even when your own employee is not exposed to the alleged hazard. A. The Controlling Employer Policy OSHA’s current controlling employer policy has been effective since 1999. That policy applies to multi-employer worksites, which means virtually all construction sites. Under the policy, OSHA can cite the creating, exposing, correcting, or controlling employer. A creating employer is one who creates the hazard to which workers are exposed. The exposing employer is one who permits his employees to be exposed to the hazard, whether it created the hazard or not. The correcting employer is one who is responsible with correcting known hazards. Finally, the controlling employer is one “who has general supervisory authority over the worksite, including the power to correct safety and health violations itself or require others to correct them.” Most general contractors and CM’s are controlling employers. Under OSHA’s policy, a contractor’s OSHA safety obligations hinges on whether it is a creating, exposing, correcting, or controlling employer. The creating, exposing, and correcting contractors obligations are fairly straightforward. However, the controlling contractors obligations are more nuisanced. Read the court decision
    Read the full story...
    Reprinted courtesy of Wally Zimolong, Zimolong LLC
    Mr. Zimolong may be contacted at wally@zimolonglaw.com

    An Oregon School District Files Suit Against Robinson Construction Co.

    March 19, 2014 —
    The Tigard-Tualatin School District in Tigard, Oregon filed a lawsuit against Robinson Construction for water damage to the Alberta Rider Elementary school, built in 2005, according to The Oregonian. The school district “is seeking $1.4 million in damages.” According to the suit, as quoted by The Oregonian, the school district “holds Robinson responsible for faulty construction of the school’s panel siding, windows, doors, exterior walls and more.” Repairs began in December of 2011, reported The Oregonian, and the cost so far is more than one million: “The district had to replace parts of the ‘exterior wall cladding system’ and remove and reinstall ‘storefront windows and window/door assemblies to ensure watertight performance,’ in addition to other alterations, the lawsuit reads.” Read the court decision
    Read the full story...
    Reprinted courtesy of